ML20128F079
| ML20128F079 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/02/1985 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| References | |
| NUDOCS 8507080113 | |
| Download: ML20128F079 (2) | |
Text
~
MS r
JUL 0 21985 G0 -?>0')
Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN:
Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:
The March 8, 1984 revision to the NRC Enforcement Policy introduced a means of recognizing good licensee performance by providing for full mitigation of a civil penalty based on prior good performance in the general area of concern.
One of the cases where this option was exercised by NRC involved the Kewaunee Nuclear Plant.
I thought it would be informative to provide you with a copy of that NRC enforcement package so you could review our application of this aspect of the enforcement policy.
Secondly, I was particularly impressed with the quality of the presentation by Wisconsin Public Service management during the Enforcement Conference with regard to this issae. The presentation reflected an indepth analysis of the event, an assesscent of safety significance and a clear description of corrective actions which were very useful for me and my staff in reviewing this case. With the approval of Wisconsin Public Service Company, I am also enclosing a copy of that presentation for your information.
I would hope that the provision in the Enforcement Policy to mitigate certain civil penalties based on good performance would be an incentive to strive for excellence of performance at your facilities.
Crfgtnal signed by James G. Keppler James G. Keppler Regional Administrator
Enclosures:
1.
Kewaunee Civil Penalty Package dtd 03/15/85 2.
Wisconsin Public Service Presentation and Attachments See Attached List For Distribution
\\
f 5 ES?>?kleo
-s PEWt
o
.JUL 0 21985 The Cleveland Electric Illuminating 2
Company Distribution cc w/ enclosures:
J. M. Taylor, Director, Office of Inspection and Enforcement J. J. Waldron, Manager, Perry Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management Section DMB/ Document Control' Desk (RIDS)
Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.
James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health RIIEh' RIII RIII Noreli@usRM RIII RIII We he4 Jackiw/rr
/ Sha:Eer Beyson s
er 06/18/85
[p/g 4
\\