ML20128F075

From kanterella
Jump to navigation Jump to search
Forwards 850315 Civil Penalty Package for Kewaunee Nuclear Plant to Demonstrate 840308 Enforcement Policy Re Full Mitigation of Civil Penalty on Basis of Prior Good Performance.Wisconsin Public Svc Co Presentation Encl
ML20128F075
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/01/1985
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 8507080112
Download: ML20128F075 (2)


Text

4 DMD 4

CUL 0 i r/35 Docket No. 50-346 Toledo Edison Company ATTN: Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

The March 8, 1984 revision to the NRC Enforcement Policy introduced a means of recognizing good licensee performance by providing for full mitigation of a civil penalty based on prior good performance in the general area of concern.

One of the cases where this option was exercised by NRC involved the Kewaunee Nuclear Plant. I thought it would be informative to provide you with a copy of that NRC enforcement package so you could review our application of this aspect of the enforcement policy.

Secondly, I was particularly impressed with the quality of the presentation by Wisconsin Public Service management during the Enforcement Conference with regard to this issue. The presentation reflected an indepth analysis of the event, an assessment of safety significance and a clear description of corrective actions which were very useful for me and my staff in reviewing this case. With the approval of Wisconsin Public Service Company, I am also enclosing a copy of that presentation for your information.

I would hope that the provision in the Enforcement Policy to mitigate certain civil penalties based on good performance would be an incentive to strive for excellence of performance at your facilities.

Original signed'by Jarms G. Keppler James G. Keppler Regional Administrator

Enclosures:

1. Kewaunee Civil Penalty Package dtd 03/15/85
2. Wisconsin Public Service Presentation and Attachments See Attached List For Distribution 8507080112 850701 PDR ADOCK 05000346 G PDR l $$*I

$0

i Toledo Edison Company 2 ., jdi b Distribution cc w/ enclosures:

J. M. Taylor, Director, Office.

of Inspection and Enforcement S. Quennoz, Station Superintendent DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII c Harold W. Kohn, Ohio EPA James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health ~

RIII RIII RII Rg: RIII RIII fShv %EU (, O IMJ &

Davis CY Kaspler Jackiw/rr /Shafer Norelius B non 06/I8/85 j klf - Ala,MW Y