ML20128E791

From kanterella
Jump to navigation Jump to search
Addl Page 25708.1 to Transcript of 841102 Proceeding
ML20128E791
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/02/1984
From:
NRC COMMISSION (OCM)
To:
Shared Package
ML20128E748 List:
References
OL, NUDOCS 8505290472
Download: ML20128E791 (1)


Text

m 0000~-00 01

.25708.1 1

WRBagb 1

the TSI depth gauge measurements?

2 A

Not directly, I was in and out of the room.

3 O

So you would not know, I assume then, what the

(}

4 depth of the deepest crack was in the old 103 and what the 5

deepest crack was in 101, is that right, by measurement?

6 A

No, that isn't right.

I asked you if you could 17 give me-the reference which you are addressing.

There'has 8

beenJa lot of material supplied, a lot of amended material 9

also and I just wondered if you would be kind enough to give 10 me a reference.

11 O

Have you -- I understond from your prefiled 12 testimony that you had occasion to review inspections 13 provided by LILCO to ascertain crack depths.

14-A The inspection provided by LILCO, I presume you O

15 mean at-Shoreham, allowed me to Icok-at the new 103.

There 16 was no instrumentation to allow me to independently 17 determine crack depth.

18 O

No, Dr. Anderson, I was not only referring to 19 that, I was referring to other LILCO dye penetrant, magnetic 20 particle, et cetera, inspection reports that in fact you 21 reference in your answer in your supplemental testimony I 22 think on the top of page 10.

23 MR. BRIGATI:

Objection, Judge.

That testimony 24 goes only to the replacement block.

The questions being

' O)

\\-

25 asked by_Mr. Parley related to the origini 103 block and hhh5290472850521 y

ADOCK 05000322 PDR

.