e Log # TXX-93080
~
File # 10010 L
J 905.4
[Eii Ref. # 10CFR50.55a(g) it/ ELECTRIC February 4, 1993 Wlillam J. Cahill, Jr. Growt= \\% e l'rrsedent U. S. Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 SUDJECT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) DOCKET N05. 50 445 AND 50 446 UNIT 1/ UNIT 2 INSERVICE-TESTING PLAN FOR k PUHPS AND VALVES REF: 10 Electric lette-logged TXX 92302 from Mr. William J. Cahill, Jr. to the NRC, dated July 2, 1992 Gentlemen: Enclosed is Revision 1 to the Comanche Peak Steam Electric Station (CPSES) Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves in the first interval. The Plan is a combined Unit 1/ Unit 2 Plan, implementing the same requirements from the ASHE Boiler and Pressure vessel Code, Section XI, 1989 Edition of Section XI on Units 1 and 2. As discussed in the above reference, implementation on Unit I will be phased in and completed before return to power following the third re'ueling outage for CPSES Unit 1 (1RF03). The phase in process assures that the appropriate portions of the combined Plan have been implemented prior to superceding related portions of the existing Unit 1 Program Plan. Tho Unit 2 portion of the Program Plan is implemented upon issuance of the operating license for Unit 2 by the NRC. The attachment provides a detailed description of the changes made by Revision 1 to the IST in a format identical to that provided for changes to the Final Safety Analysis Report (FSAR). All changes described.in the attachment have been evaluated for relative significance (i.e. -the group number 1. 2, 3, or 4 following each change justification as discussed in TV Electric letter TXX-08467 dated June 1, 1988). In addition, all changes applicable to CPSES Units 1 and 2 have been reviewed under the TV Electric. 10CFR50.59 process and found not to include any "unreviewed' safety questions.* 080094
- ga18BaaZi888k 10d P
o p 4m n. cmy sow us, si n.n., Tex.,7320, i t
4 4 TXX 93080 Page 2 of 2 If you have any questions, please call Mr. Carl Corbin at (214) 812 8859. Sincerely, William J. Cahill, Jr. By: D. R. Woodlan Docket Licensing Hanager CBC/das Attachment Enclosure c - Hr. R. D. Hartin, Region IV Resident inspectors. CPSES (2) Hr.-T. A. Bergman. HRR Mr. G. Bynog 4 /
Attachmont to TXX 93080 F9brdary 4. 1993 Page 1 of 2 CPSES - INSERVICE TEST PROGRAM ( IST ) AMENDHENT / REVISION 1 DETA! LED DESCRIPTION Prefix Page (Al intD.did) far9yJ! Daseriotion I Cover-3 Changes IST Plan Cover Sheet to reflect new revision 1. Deletes OA Hanager's signature from approval block. Update Editorial changes to the IST Plan Cover Sheet to reflect current revision status and to recognize a previous change to QA departmental procedures which no longer requires OA Hanager review of IST Plan changes. Change Requesa Number
- IT-93 1.3 Commitment Register Number :
Related SER : SSER : SER/SSER 1mpact
- No Table 4-2 See Sheet No(s) :1 Revises Table 4. Chemical and Volume Control System to delete the closed safety function position for Boric Acid Transfer Pumps miniflow check valves (XCS-0037. XCS-0039. XCS 0041. XCS-0044) and to editorially change the Remarks field to properly state the valves
- open safety function position as
" pump miniflow path". Revision Following implementation of DH 89 333. the Boric Acid Transfer Pump miniflow check valves no longer have a closed safety function. This change will update the IST Plan to reflect current plant design. Prior NRC approval is not required per the guidance of STA-119. Attachment 8.B since this change is allowed by ASHE Section XI (i.e., the ASHE Section XI requirement for these valves is only to exercise them to their safety function position). Change Request Number
- IT-93 1.1 Commitment Register Number :
Related SER : 3.9.6 SSER :23 3.9.6 SER/SSER Impact-
- No Table 7-2 See Sheet No(s) :3 and 4 Revises Table 7. Diesel Generator Auxiliaries to delete the closed safety function position for the Engine Lube Oil Pumps suction check valves (100-0157, 200 0157, 1D0-0257 and 200-0257) and editorially changes the Remarks field to properly state only the valves' open safety function.
Revision Following discussions with the Diesel Generator vendor, the Engine Lube Oil Pumps suction check valves are now recognized to not have a closed 1
Attachmont to TXX 93080 F6bruary 4, 1993 Page 2 of 2 4 Prefix Page (as amended) Gtown Detcrin1199 safety function. This change will update the IST Plan to reflect the current design basis. Prior NRC approval is not required per the guidance of STA 119, Attachment 8.B since this change is allowed by ASHE Section XI (i.e., the ASHE Section XI requirement for these valves is only to exercise them to their safety function position). Change Request Number
- IT 93 1.2 Commitment Register Number :
Related SER : 3.9.6 SSER 323 3.9.6 SER/SSER Impact
- No Table 13-2 See Sheet Nof:' 17, 15 and Notes Revises Table is, Safety injection System to require exercise testing of hot leg injection check valves (1 8841A & B, 2 8841A & B 1 8949B & C 2 89498 & C) at refueling outage frequency versus cold shutdown frequency as previously stated.
Also, revises Table 13 Notes to document the impracticality of testing these valves at cold shutdown frequency. l Revision During test procedure development, the impracticality of testing the subject valves at cold shutdown frequency was identified. On the basis of this impracticality, the test frequency is being changed to refueling outage. Prior NRC approval is not required per the guidance of STA-119 Attachment 8 B since this change is allowed by ASHE Section XI (i.e., ASHE Section XI allows that if exercising is not practicable during plant operation or cold shutdown, it may be limited to full-stroke during refueling outages). Change Request Number
- IT 93-1.4 Commitment Register Number :
Related SER : 3.9.6 SSER :23 3.9.6 SER/SSER Impact
- No
.:__-_=
_. ~.. _ _ _ _ _. _ _ _... _ - _ _ _ _ _.. i j i CPSES/IST COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 i INSERVICE TESTING PLAN FOR PUMPS AND VALVES FIRST INTERVAL INSTRUCTION SHEET The following instructional information and checklist is being furnished to help 3 insert Revision 1 into the Comanche Peak Steam Electric Station IST. A l description of this revision is provided in TXX-93080, dated February 4, 1993. Discard the old sheets and insert the new sheets, as listed below. Keep all instruction sheets in the front of the Effective Page Listing to serve as a record of changes, i Remove Insert Cover Sheet Cover Sheet Table 4 Page 1 of 12 Page 1 of 12 IAble.7 Page 3 of 4 Page 3 of 4 Page 4 of 4 Page 4 of 4 Table 13 Page 7 of 17 Page 7 of 17 i Page 15 of 17 Page 15 of 17 Second Page of Notes Second Page of Notes thru the Fourth Page thru the Fourth Page 2 k i -..y. .,}}