Discusses Proposed License Amend to Update Pressure Temp Limits & Low Temp Overpressure Protection Enable Temps, Per Commitment in Util .Pressure Temp Limit Calculations Currently Being Reviewed
ML20128E537
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/02/1992
From: Rainsberry J
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9212080117
Download: ML20128E537 (2)


Text

.

4

./ N AD12 3

Southem Califomia Edison Company

/ 9 P'AMKL M CTRE El INVINE. CALIFOHNIA 977t h December 2, 19..

a nAins m nv

,,u,._

.- m,1^?, Z 7'72,U" Z 7. m.m.

" " ' ' ~ ' "

n U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-361 and 50-362 Proposed License Amendments to Update the Pressure-Temperature Limits and Low Temperature Overpressure Protection Enable Temperaturee San Onofre Nuclear Generating Station Units 2 and 3

References:

1.

February 24, 1992, letter from R. M. Rosenblum (SCE).to Document Control Desk,

Subject:

Docket Nos. 50-361 and 50-362, Proposed License /,mendments to Update the. Pressure-Temperature Limits and Low Temperature Overpressure Protection Enable Temperatures, San Onofre Nuclear Generating Station, Units 2 and 3 2.

September 9, 1992, letter from Harold B. Ray (SCE) to Document Control Desk,

Subject:

Docket Nos. 50-362, Amendment.

Application No. 102, Changes to Technical Specifications 3/4.4.8.1, 3.4.8.3.1, and 3.4.8.3.2, San Onofre Nuclear Generating Station, Unit 3 By Reference 1 Southern California Edison (SCE) 4.ommitted to submit 1) by September 11, 1992, a license amendment request updating the existing Unit 3 Reacter Coolant System (RCF) Pressure-Temperature (PT) lini:ts and 2)-by October 30, 1992, a license amendment request updating the existing Ur.it 2 PT limits.

By Reference 2 the above commitment for San Onofre Unit 3 was fulfilled.

'However, in finalizing-the Unit 2 PT limits, questions arose concerning the conservatism of the calculations and the October 30, 1992 commitment for San Onofre Unit 2 could not be met. This concern.also applies-to the Unit 3 PT limits submitted by Reference 2.

We are currently reevaluathg the Units 2 and 3 P1 limit calculations and will revise these calculations before submitting the license amendment request to update the existing Unit 2 PT limits.

Therefore, the Unit ?. license amendment request will be submitted by May 7, 1993.

If the results of our reevaluation also require a change to the PT limits for Unit 3, we will submit a revision to Reference 2 by May 7, 1993.

9212080117 921202 DR ADOCK 05000351-h=

PDR-

i Docilment Control Desk At San Onofre Units 2 and 3 we have implemented administrative PT limits that are more restrictive than the PT limits from the calculations of record.

The results of our preliminary reevaluation indicate these administrative limits remain bounding. Therefore, there is no safety impact to the delay in the submittal of the updates for the Units 2 and 3 PT limits.

if you have any questions regarding these matters, please let me know.