4 CD&L Carolina Power & Light Company P,0 Box 1551 e Raleigh, N C 27602 February 1, 1993 R B STARKEY.JR Vee President Nuclear Services Departmern 10 CFR 50.54(f)
United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50.325 & 50-324/ LICENSE NOS. DPR 71 & DPR-62 IMPLEMENTATION OF GENERIC LETTER 90-03 REQUIREMENTS
REFERENCES:
1.
NRC Generic Letter 90 03, " Relaxation of Staff Position in Generic Letter 83-28, item 2.2, Part 2, ' Vendor interface for Safety-Related Components,'" March 20,1990 2.
Carolina Power & Light Company (CP&L) Letter from Mr. A. B. C9tter to United States Nuclear Regulatory Commission, " Generic Letter 90-03 Response" (NLS-90-184),
September 25,1990 3.
NRC Letter from Mr. Ngoc B. Lo (NRC) to Mr. L. W. Eury (CP&L), " Response to NRC Generic Letter 90-03, ' Relaxation of Staff Position in Generic Letter 83-28, item 2.2, Part 2. Vendor Interface for Safety-Related Components,' for Brunswick Steam Electric Plant, Unit Nos.1 and 2," May 13,1991 Gentlemen:
The purpose of this letter is to provide additionalinformation requested by the NRC letter dated May 13,1991 (Reference 3) concerning CP&L's NRC Generic Letter 90-03 Response (Reference 2). That letter ir dicated the Staff had reviewed CP&L's response to Generic Letter 90 03 and found it acceptable. Carolina Power & Light Company was also requested to inform NRC when the actions required to upgrade the vendor interface program to comply with the Generic Letter requirements are implemented for the Brunswick Steam Electric Plant (BSEP).
Carolina Power & Light Company has completed modification and enhancement of the BSEP vendor interface program for safety-related components, implementation of the enhanced BSEP vendor interface program has begun, resulting in the strengthening of the document control system which previously existed between the NSSS vendor and BSEP, to provide a method of assuring receipt of technical information concerning safety-related components within the NSSS scope of supply.
Vendor contacts have been initiated with vendors of other safety-related components. A control process has been initiated to incorporate and update pertinent information covered by this program as it is obtained. Vendors of safety-related components for BSEP will be contacted within a three-year period, and these vendors will be re-contacted on a recurring, three-year cycle. Future vendors of safety-related components for BSEP will be included in this program as they are added to the vendors list.
9302100391 930201 r
PDR ADOCK 05000324 g
P PDR
s
- o Docurpent Control Desk
- NLS 92 335 / Page 2 Carolina Power & Light Company has determined that the current BSEP vendor interface program -
for safety related components includes the aspects of Elements A and B of Generic Letter 90-03 and has begun implementation in accordance with our commitment of September 25,1990.
~
Please refer any questions regarding this correspondence to Mr. D. C. McCarthy at (919) 546-6901.
Yours very truly,
'h q
R. B. Starkey,.ir.
JCP/jcp (nis92335.wpf)
I cc:
Mr. S. D. Ebneter Mr. P. D. Milane Mr. R. L. Prevatte R. B. Starkey, Jr., having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light