Forwards Insp Repts 50-245/92-26,50-336/92-28 & 50-423/92-22 on 921019-23 & 1102-06 & Nov.Review Identified Good Efforts on Previously Identified Matters
ML20128E130
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/27/1992
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20128E134 List:
References
NUDOCS 9212080008
Download: ML20128E130 (5)


See also: IR 05000245/1992026

Text

.>

. DCh

s

4a

NOV. 271992

Docket Nos. 50-245

50-336

50-423

hir. Jahn F. Opeka

Executive Vice President - Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

Hartford, Connecticut 06141-0270

Dear hir. Opeka:

Subject: NRC Con.bined Inspection Mos. 50-245/92-26; 50-336/92-28;

50-423/92-22

An announced safety inspection of the radiological controls, radioactive waste handling, and

radioactive waste transportation programs at the hiillstone Nuclear Power Station was conducted

by hiessrs J. D. Noggle and R. L. Nimitz on October 19-23 and November 2-6,1992. The

inspection findings were discussed with members of your staff on October 23 and November 6,

1992.

Areas reviewed during the inspection were important to health and safety and are discussed in

the enclosed inspection report. These areas included review of: action on previous findings; _

audits; organization and staffing; solid radwaste waste streams; transportation and solid

radwaste; steam generator shipment preparation; radioactive and contaminated material, and ,

contamination controls; radiological controls; and station housekeeping.

The inspector's review identified very good efforts on previously identified matters.

Improvement in the quality of audits of the radiological controls program was noted. The

radwaste and radiological controls organizations were found to be adequately staffed. Good

control of radioactive and contaminated material, and contamination was identified bat two

issues, associated with identification of a contaminated ga-ge in a warehouse and lack of defined

alarm set point for site egress portal monitors were identified as issues needing further review

by your staff. The circumstances surrounding the release of the contaminated gauge is

considered an unresolved item. Preparation and planning for the shipment of the No. 2 steam

generator were good. The radiological controls program was considered overall to be effective

in reducing aggregate radiation exposure of personnel. Housekeeping was considered good,

r

9R12080000 921127

DR ADOCFOSOOg5

0FRCIAL RECORD COPY r

% 'q.i a>

. i i.

_ _ _ ____ _ _ _ ______ _- _ _ _ _ _ - .

,

0

..

t ..

'

NOV. 2 71992

.

Northeast Nuclear Energy Company 2

Two violations were identified. The first violation involved failure to collect representative

samples of Unit 2 resins for determination of curie content for shipping purposes. The violation

is presented in Enclosure 1, Notice of Violation (Notice). You are required to respord to the

Notice and should follow the instructions provided therein. The second violation involved

failure to post certain liigh Radiation Areas inside the Unit 2 containment. Because other signs

and postings, which provided workers appropriate radiological controls information, were posted

at the areas, and appropriate corrective actions were taken to address this matter, the violation

was considered of minor safety significance and in accordance with the Enforcement Policy

(Section Vll.B.1) is not being cited.

Your cooperation with us is appreciated. -

Sincerely,

Original Signed By;

James H. Joyner

James H, Joyner, Chief

Facilities Radiological Safety-

and Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosures: _

l. Notice of Violation

2. NRC Con.oined Inspection Report Nos. 50-245/92-26;50-336/92-28;

50-423/92-22

,

0FFICIAL RECORD COPY

_ __ _ _ _ _ _ _ _ _ _ _ _ i

. _ . . .

,. .

..-

"

NOV. 271992 ~

. Northeast Nuclear Energy Company 3

cc w/ ends:

W. D. Romberg, Vice President, Nuclear Operaticas

S. E, Scace, Nuclear Station Director

H. F. Haynes, Nuclear Unit Director

J. S. Keenan, Nuclear Unit Director

C. H. Clement, Nuclear Unit Director -

R. M. Kacich, Director, Nuclear Licensing

D. O. Nordquist, Director of Quality Services

Geral_d Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO (2)

Public Document Room (PDR)-

Local Public Document Room (LPDR) -

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut SLO Designee

--

I-

L

,

!~

i

1

i

!

l-

OFFICIAL. RECORD COPY

a

. . .

,

. .

-

NOV. 271999

4

Northeast Nuclear Energy Company 4

bec w/encls: ,

Region I Docket Room (with concurrences)

DRS/ Ell SALP Coordinatoi

J. Joyner, DRSS

R. Illough, DRP

L. Doernien, DRP

W. Raymond, SRI, Haddam Neck

P. Swetland, SR', Millstone

V. McCree, OEDO

D. Jaife, PM, NRR

G. Vissing, PM, NRR

V. Rooney, PM, NRR

R.13arkley, DRP

OFFICIAL RECORD COPY-

_ _ _ _ _ _ - _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

..

,.

..

'

,

NOV. 2 719b?

Northeast Nuclear Energy Company 5

_

RI:DRSS RI:DRSs i 1. - ) SS RI:DRSS

[L PLU \\q

Noggle Nimitz Pas 'ak Joyner

11 AT92 11/h/92 j 92 1IQ/92

OFFICIAL RECORD COPY

l

. _ _ _ _ _ . _ _.m __ _.. _ .._._. .a_my