i I

dC

~

w PDR i

SEP 111973 fhlhS D. Skovholt, Assistant Director for Operating Reactors, L Oyy-CAS SYSTDI ACCIDENT ASSESSMENT FOR MONTICELLO - TAR-590 This is in response to your request for calculations to estimate the dose consequences of a break in the modified off-gas system proposed for Konticello (TAR-590).

The Accident Analysts Branch has evalueted the dose consequences of a postulated f ailure of the proposed off-gas system of the Monticello Nucicar Power Plant. Table 1 provides' the assumptions used in the calculation and Table 2 provides the calculated doses.

The analyeis considers a noble gas composition specified in G.E. Topical Report NEDO 10734 based on a release rate of 100,000 microcuries per second af ter a 30 minute delay. We have scaled this up to 350,000 microcuries per second after a 30 minute delay.

The analysis indicates that a failure of the Monticello off-gas system consisting of a total release within two hours of the contents of the delay line, and - five hold-up tanks, including staan jet air ejector isolation within one hour will result in a two hour whole body dose at the site boundary of 6.5 ren, in excess of the 5 rem whole body guideline we entrently use for.

plants of this vintage to define Category I seismic design requirements.

(New plants would have to meet a 500 nr limit.)

The off-gas release rates for Monticello should be limited to 270,000 microcuries per second.af ter a. 30 mismte delay in order to keep the potential whole body dose below 5 rem at the site boundary.

This work was performed by Joel E. Kohler of the Accident Analysia Branch.

$ Natl signed by R.' R, p.og Barold R. Denton, Assistant Director for Site Safety Directorate of Licensing cet See next page.

tLLA 0FFICE >

$URNAME>

DATt >

- + -

Form AIC-Sta (Rev.9-53) AE('M 0240

'44-t4-a1443-t 4 s-ers 9212070463 730911 PDR ADOCK 05000263-P FDR

s D. Skovholt 2

SEP 11 W3 Encleeures Table 1 Table 2 ce - w/o emel, A. Siambuseo W. Mcdonald w/enei.

-S. Hanauer J. Hendrie F. Anderson R. Eavadoeki J. Kohler DISTRIBUTION:!

Central file L-Rdg.

L-AD/SS L-AAB T

A-ij omes >

f - '-

pAb.. B.........

Lt

).

,. 7k sun =amc >

.K..o..h..l.e.. r..:.J a.......

..r..i..m..e..s......

.....H.R..D....o..n.......

.. _.f oarc >

. 9/.7U.a..,.

. 9//94.3.....

9./. LU.

_..n... _....

roi. AEC.m (Re. 9.W AECM OMO

~

.-- a o*e

. v a...mm_...........

a-etown esses.-

omec >

.....kt AAB.,.....

...MMR...

.........kt S S............................b...........................-.....

JKohlertjml BGrimes.

HDenton sumut >

..I.. 9L../.23..... 9/....DI. _.. _.

oarc >

. 9/.....H 3..

rorm AfCala (Rev.9 63J AECM 0240 ore ets-is-sissa.t

+4 H rs -

c.

s TAht.E 1 0FF CAS ACCIDENT ASSltMPTIONS Power Level (MWt) 1630 Number of Units Using Common Delay Line 1

Condenser Leak Rate (SCFM) 28 Number of Hold-Up Tanks 5

liold-Up Time per Tank (hrs.)

12 Delay Time to Tank (min.)

30 Noble Gas Release Rate (after 30 minute delny) (uct/see) 350,000 Iodine Release Rate (uC1/sec)

.5 3

Safety Guide 3 Neteorology (sec/m )-

2.0 x 10'3 Minimum Site Boundary (meters) 500 Accident Duration (hrs.)

2 Isolation Time for Steam Jet Air Ejector (hrs.)

1

_mmm_.2.

_...m_%w--..'

(1 s

TABLE 2 Th'O HOUR SITE BOUNDARY DOSE ($00m) b* hole Body Dose

_ Thyroid Dose Steam Jet Air Ejector 3.10

.002 Delay Line

.569

.001 Tank 1 1.92

.452 Tank 2

.418

.425 Tank 3

.214

.403 Tank 4'

.142

.383 Tank 5 2

_.111

.365 4

TOTAL 6.47 2.03 i

5 j

i-i f

t i

1 1

l-i l

l 4.

p i

l

~

- - -., -, - -.. - -... -