ML20128E049
| ML20128E049 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/27/1993 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Boulette E BOSTON EDISON CO. |
| References | |
| NUDOCS 9302100295 | |
| Download: ML20128E049 (4) | |
Text
.
g JAN 2 71993 Docket No. 50-293 Boston Edison Company ATfN: Dr. E. Thomas Boulette Senior Vice President-Nuclear Pilgrim Nuclear Power Station RFD#1 Rocky Hill Road Plymouth, Massachusetts 0~2360
Dear Dr. Boulette:
The U.S. Nuclear Regulatory Commission recently received information concerning activities at the Pilgrim Nuclear Power Station.
This information was verbally discussed with Mr. Edward Kraft of BECo by Gene Kelly, of my staff on January 26, 1992. Details are enclosed for your review and follow-up.
We request that a written response be submitted to Region I within 30 days of this letter. We request that your response contain no personal privacy, proprietary, or safeguards information so it can be released to the public and placed in the NRC Public Document Room. If necessary, such information shall be contained in a separate attachment, appropriately marked, which will be withheld from public disclosure. The affidavit required by 10 CFR 2.790(b) must accompany your response if proprietary information is included.
The enclosure to this letter should be controlled and distribution limited to personnel with a "need to know." The enclosure to this letter is considered Exempt from Public Disclosure in accordance with Title 10 Code of Federal Regulations, Part 2.790(a). However, a copy of this letter, excluding the enclosure, will be placed in the NRC Public Document Room.
The response requested by this letter and the accompanying enclosure are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L.96-511.
OFFICIAL RECORD COPY 7i 9302100295 930127 i
PDR ADOCK 05000293 p
JAN 2 71993 Boston Edison Company 2
Your cooperation with us is appreciated. We will gladly discuss any questions you may have concerning this information.
Sincerely, orealNAL SX1NED BY; Charles W. Hehl, Director Division Director
Enclosure:
Information Details (10 CFR 2.790(a) INFORMATION) cc: w/o enclosure Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/ encl)*
- CONTAINS 2.790(a) INFORMATION OFFICIAL RECORD COPY
JAN 2 71993 Boston Edison Company 3
bec w/ encl:*
R. Fuhrmeister, ORA (File RI-93-A-0017)
D. lxw,- DRP
- CONTAINS 2.790(a) INFORMATION RI:DRP
' RI: SAC I:DRP
- D P,
RP R
n-RFuh ster 1
01/2493 Olb93 01p 3
- 01//p
-01M 3
/
OFFICIAL RECORD COPY a:INFOLTR
ENCLOSURE TIIIS PAGE CONTAINS 10 CFR 2.790(a)
INFORMATION AND IS NOT FOR PUBLIC DISCLOSURE. TIIIS PAGE IS
-INTENTIONALLY LEFT BLANK.
P
- _ -. _ _ _ _ _. - - _ _ _ _ _ _ _ - - - _ -. - - _