ML20128D955

From kanterella
Jump to navigation Jump to search
Forwards Notice of Violation from Insp on 850301-31 & 0401-16.Insp Rept 50-267/85-07 Will Be Issued in Future
ML20128D955
Person / Time
Site: Fort Saint Vrain 
Issue date: 04/26/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20128D959 List:
References
NUDOCS 8505290254
Download: ML20128D955 (4)


See also: IR 05000267/1985007

Text

rs

-

_

.-

y .

'%

.x

APR 2 61985

,

JIn Reply Refer To:

~

Docket: 50-267/85-07-

.

Public' Service Company of Colorado

.

ATTN:. 0. R. Lee,;Vice President

' Electric Production

.P.:0.~ Box 840'

Denver, Colorado

80201-

'

J$ntlemen:

G

This' refers 'to the inspection conducted by Mr.

G., L. Plumlee III of this office

during the ' period March '1-31 and April 1-16, 1985, of activities authorized by

NRC Operating- License DPR-34 ^for Fort St. Vrain Nuclear Generating Station, and

to the discussion of our findings with Mr. J. W. Gahm, and/or other members' of

' your staff at the conclusion of the inspection. The findings of this

-

inspection were also discussed with you during an enforcement conference .in the

-Region IV offices on April 24, 1985. A list of attendees at this conference.is

enclosed (Enclosure 1)

Areas examined during the inspection included control-rod-drive-refurbish-

ment,-helium-circulator refurbishment, maintenance, and surveillance.

~

LWithin'these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

' observations by the inspector.

-During this inspection, it was found that certain of your activities were in

Eviolation of NRC. requirements. Consequently, you are required to respond to

.-these violations', in writing, in accordance with the provisions of'

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of .

Federal Regulations. Your response should be based on the specifics contained

intheNotice~ofViolationenclosedwiththislette'r(Enclosure 2). Since

these . violations are related directly to the control-rod-drive-refurbishment

program which is now taking place, it is essential that you take immediate

corrective actions to assure:that maintenance quality control (MQC) requirements

- are met during all remaining refurbishment work. The letter you agreed to send '

by April 26, 1985, stating your actions and commitments in response to the.

enforcement conference, should satisfy a portion of the required response to

these violations. Your full response should address the effects that skipping

o

--of hold points may have had on the adequacy of refurbishment work already

  • '

completed.

,

Details of.this inspection will be included in a report to be issued in the

near future' and identified as NRC Inspection Report 85-07.

__

. _

- ~

_ _ . . . _ .

___

___.

RPB1 Y

RIV:SPESh

SPES

h

[/

0

GLPlumleE/Is

REIrelhnd

EHJohnson

V 4/g/85

q/s/85

4/d/85

Y\\

8505290254 eso426

\\

PDR

ADOCK 05000267

/

-

PDR

G

.t

s

,

_

-

<

[

'

.-,,---n

. . -

e . - - , ,

--n.---

-n.w_.,_n,e

+

-.

'

.

-

4

,

_

.

r

I

' Public Service Company of Colorado

.-2-

The response directed by this' etter and the accompanying Notice.is.not subject

l

~to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

'Should you have any questions concerning1this inspection, we will be pleased to

. discuss them.with you.

.

Sincerely.

-

~

,

E. H. Johnson, Chief

Reactor Project Branch 1

- Enclosures:-

1.

List of Attendees

2.

-Appendix A - Notice of Violation

.cc w/ enclosures:

' Mr. D. W. Warembourg, Manager -

Nuclear. Engineering Division

.Public Service Company of Colorado

'

P.' O. Box 840-

Denver, Colorado -80201

Mr' David Alberstein,14/159A

.-

.GA Technologies, Inc..

-P.:0.'-Box 85608

iSan'Diego, California.

92138'

e ~

'Kelley,'Stansfield & 0'Donnell

.r

Public Service Company Building

550'15th Street, Room 900

.

Denver,-Colorado' 80202

Chairman, Board of County Comm.

of Weld County, Colorado

iGreeley.. Colorado 80631

,

Regional' Representative

Radiation Programs'

,

Environmental Protection Agency.

1860 Lincoln Street

'

Denver,l Colorado 80203

,

(cont.on.nextpage)

_

"'

aypwwy,y-9+

p,

g , ,--

g-

m.a.q1u

=

,9. m

,pg.,y,w -gswe m

-pg,,t-m+t'4e..u

gggwv-v

,.

Public Service Company of Colorado

-3-

Mr. H. L. Brey, Manager

Nuclear Licensing / Fuels Div.

'Public Service Company of_ Colorado

P. 0.-Box 840

Denver, Colorado- 80201

- J.: W. 'Gahm, Manager, Nuclear-

Production Division

Fort'St. Vrain Nuclear Station

'16805 WCR 191

Platteville, Colorado 80651

L. Singleton, Manager, Quality

Assurance . Division

(sameaddress)

bec distrib. by RIV:

RPB1

R. D. Martin, RA

Resident Inspector

R. Denise, DRS&P

SectionChief(RPB1/SP&ES)

EP&RPB

E. Haycraft, DRSP/LA~

RIV File

P. Wagner .RPB1

RSTS OPERATOR

J. Miller, ORB 3

MIS System

D. Powers, RPB1

D. Weiss, LFMB (AR-2015)

' COLORADO STATE DEPT. HEALTH

c

,

.

Enclosure 1

ATTENDANCE LIST.

Attendance at the Public Service Company of Colorado - NRC meeting on

April 24, 1985, at the NRC Region IV office.

Public Service Company

0. R. Lee, Vice President, Electric Production

J. W. Gahm, Manager, Nuclear Production Division

L. W.. Singleton, Manager, Quality Assurance Division

H. L. Brey, Manager, Nuclear Licensing and Fuels Division

NRC, Region IV

P.15. Check, Deputy Regional Administrator

,

R. P. Denise, Director, Division of Reactor Projects and Safety

E. H. Johnson, Chief, Reactor Project Branch

G. L. - Plumlee, Senior Resident Inspector

M. E. Skow, Reactor Inspector

D. A. Powers, Technical Reviewer

~P. C. Wagner, Project Manager

R. E. Ireland, Chief, Special Projects and Engineering Section

)

l

l

l

l

L