ML20128D926
| ML20128D926 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 03/20/1974 |
| From: | Skovholt D US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Stello V US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 9212070424 | |
| Download: ML20128D926 (2) | |
Text
__ _ _____
i i
f prz MAR Z 01974 1
i t
Docket No. 50-263 i
i 1.
I V. Stello, Assistant Director for Reactor Safety, L PRT AND TRANSIENT AllALYSIS REVIEW SCHEDULE l
To meet our connaitinents to Northern States Power for review of the Proset Relief Trip (PRT) and the related analytical methods for over-pressure transients, we havo developed the following schedule. Your concurrence by March 22, 1974, is requested.
Prompt Relief Valve Trip _ _(PRT),
April 26,1974 - TR completes evaluation of safety aspects of j
Honticello startup with PRT connected
- May 3,1974 - AEC-L evaluation of Monticello PET connections issued 1
i May 10, 1974 - TR questions related to use of PRT or preparations i
I for a meeting with NSP representatives i
l June 23,1974 - TR completes safety evaluation - Credit for Ptf l
f
for scram reactivity issued l
Analytical Methods of Plant Transient Evaluations for the General t
l Electric Boiling Water Reactor (Ref. NEDO-10802 - February 1973, lisp submittal related to PRT and reduced pressure relief capacity -
i January 23, 1974, and "BWR Overpressure Protection" note provided with TAR 868) l April 15, 1974 - TR issuen questions related to the references above I
j
- April 19,1974 - Questions to CE and NSF issued
9212070424 740320 PDR ADOCK 05000263 p
. _ ~
y i
1 M.
V. Stallo !
g,gg 4
i.
l 4
j June 3,1974 - Additional TR questione-or meeting with GE and NSP representatives 4
July 12,1974 - T1 evaluation released
- August 14, 1974 - AEC-L evaluation issued I
Only the astericked items will be shown in the schedule forwarded to 82P. The final issuance dates in August are consistent with your earlier i
l statement (February 19,1974) and fall within the expected operational 4
period at the BOC 3 when dependence on the PRT for reactor protection l
is not required.
t i
Original s mma a a
l D J, rkovbolt Donald J. Skot %1t Assistant Ditwater for Operating Reactors Directorate of Licensing I
i l
i
}
l Distribution l
McketFile l
Branch Reading i
i DJSkovholt, L 0R I
TJCarter, L:0R
{
DLZiemann, L 0RB #2 l -
JJShea, L:0RB #2 j
RMDiggs, L:0RB #2 ORB #2 File 4
4 4
I d
i I
i i
I i
l
?
L:0RB #2 _,, _L,,:0RBf L
- 2__,..
_,L:0 i
ome s,
X70.1_ d.I I_
I JJ.S.hed?a31t
_RE ggs _
LZi nn.
..DJS holt-l ava.= s
- I 3.../20/74 _
.. 3._/20._/ 7..4.....3/2 4/74
-_/h_)/74 3
can
- l 1.,. AEC.318 (Rev. 9-53) AECM 0240 are cas se e,4e s.
es e.s ea
-