Application for Amend to License DPR-44,consisting of TS Change Request 93-05 Re LCO for Safety & Relief Valves Due to Present Inoperability of One SRV
ML20128D772
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 02/02/1993
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128D776 List:
References
NUDOCS 9302100224
Download: ML20128D772 (8)


Text

. _ _ _ - _

PIllLADELPillA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS.

n55-65 CllESTERBROOK BLVD.

WAYNE, PA 19087-5691 February 2, 1993 Docket No. 50-277 License No. DPR-44 NUCIIAR SERVICES DLPARTMENT U.

S.

Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

Subject:

Peach Bottom Atomic Power Station, Unit 2 Exigent Technical Specification Change Request

Dear Gir:

Philadelphia Electric Company (PECo) hereby submits Tachnical Specification Change Request Number 93-05, in accordance with 10 CFR 50.90, requesting an amendment to the' Technical Specifications (Appendix A) of Operating License No. DPR-44 for Peach Bottom Unit 2.

The current situation at PBAPS Unit 2 with one Safety Relief Valve (SRV) inoperable because of a-failed bellows indication, conforms to the 10 CFR 50.91(a)(6) description of an exigent situation.

To prevent a plant shutdown in compliance with a Limiting Condition for Operation (LCO), PECo requests that this application be processed as an exigent change as permitted by 10 CFR 50.91 (a)(6).

Currently, one of eleven SRV is inoperable.

Correcting the problem requires a shutdown to access-equipment in the drywell.

In accordance with Technical Specification 3.6.D.2.(a), an orderly shutdown must be initiated on February.16, 1993.

PECo proposes that this situation satisfies the exigent criteria set forth in 10 CFR 50.91(a)(6) because failure to act in a timely manner would result in a shutdown of the unit.. PECo has applied for this amendment in a timely fashion.and could not have foreseen this situation.

PECo respectfully requests that the NRC process this amendment application in an exigent manner.

On the morning of January-29, 1993 NRC Region I and NRC Headquarters personnel were contached to discuss this request.

If you have any question regarding this manner,.please contact us.

Ver truly y 080010 Jrs M

~

G. J Beck, Manager Licensing Section

Enclosure:

Affidavit, Attachments 1 and 2 cc:

T. T. Martin, Administrator, Region I, USNRC J. J. Lyash, USNRC Senior Resident Inspector, PBAPS g.I g!

i W.

P. Dornsife, Commonwealth of Pennsylvania t

9302100224 930202

\\

3 PDR ADOCK 05000277 p

PDR

o Commonwealth of-Pennsylvania :

County of Chester-

^

G. R..Rainey, being first duly sworn,-deposes-and says:-

That he is Vice President of-Philadelphia Electric: Company; that Applicant herein; that he has read the attached Technical ~

Specification Change Request (Number 93-05) for Peach Bottom Facility.

Operating License DPR-441and knows the contents thereof; and that the, stator..cnts-and matters set forth therein-'are-true"and correct to-:the best of his knowledge,- information and belief.-

i f./ W

l.

~

Vice President

-Subscribed.and sworn to before me-thisMndL

. day of-I' p

)

-r

- r DJ W

i Av.,,g;-

i N o t'a r'y: P u b l i c

i

. $d S0015b-

=-

A. Saran WNY wc$dE1*sSEINO"5 g

.I I

f

.o.

...-.~

t i

1.

+

-Attachment I.

Peach Bottom Atomic < Power' Station Unit'2' Docket No..50-277 1

License No DPR-44 i '

T

--Technical Specification. Change:LRequest 93-05 Exigent Technical Specification ~: Change-Request"-

3 I

Supporting Information:for: Changes:51pages.

i i

t 3

g.,

I e

d e

e i-1:j

.Ex,igant TSCR - PBAPS Unit 2 Fcbrucry 2, 1993 Docket No. 50-277 Page 1 Philadelphia Electric Company (PECo), Licensee under Facility Operating License DPR-44 for Peach Bottom Atomic Power Station (PBAPS)-Unit 2, requests th6t the Technical Specifications contained in Appendix A to the Operating License be amenced.

Proposed changes to the Technical Specifications are indicated by vertical bars in the margin of the affected page.

The proposed revised page 147 is included in Attachment 2.

7 Description of Changes 1)

The Licensee proposes that Technical Specification 3.6.D.2.(a) be revised to include an asterisk and that page 147 of PBAPS Unit 2 Technical Specification be revised to include the asterisk statement: "This 30 day LCO has a one time extension until the next outage of sufficient duration that requires a drywell entry.".

Safety Discussion In performing the safety evaluation for this proposed change, a conservative assumption was made that thq bellows of one Safety Relief Valve (SRV) has failed.

In July of 1992, the " Bellows Leaking" annunciator alarmed.

When the alarm wee investigated, no problems with the valve or the bellows were found.

The bellows were vacuumed to remove moisture and the pressure switch was calibrated.

Together with the valve manufacturer (Target Rock) and General Electric (GE) we concluded that this alarm uas most likely caused by moisture in the bellows / pressure-switch interface.

This moisture was-heated during startup and the increased pressure brought.up the alarm.

We do not know the cause of the present alarm; however, we have conservatively declared the SRV inoperable and for the purposes of this evaluation we have assumed the bellows has failed.

At this time, SRV RV-2-02-71B has been declared inoperable for the pressure relief function because of a possible failed bellows.

Incorporation of this Tcchnical Specification change will. allow reactor operation until the next outage of sufficient duration to-make repairs and which requires a drywell entry.

The analyses that were performed to support this change request confirm that the reactor can be safely depressurized even in the bounding accident conditions (i.e., MSIV closure overpressure transient and ATWS condition) with only ten SRVs available.

Peach Bottom is designed with eleven SRVs and two safety valves.

These valves are designed to protect the reactor vessel by providing pressure relief during high pressure transients.

There are three different setpoints; 1105 psig, 1115 psig, or 1125 psig, for the SRVs.

The safety valves will relieve at 1230 psig.

,Ex,igant TSCR - PBAPS Unit 2 Fcbrucry 2, 1993 Docket No. 50-277 Page 2 Five of the SRVs (RV-2-02-71A, B, C, G, and K) are also Automatic Depressurization System (ADS) valves.

Under certain transient conditions,-these valves will automatically open to depressurize the reactor until the low pressure Core Spray and/or Low Pressure Coolant Injection systems can inject.

All eleven SRVs can be manually actuated to manually depressurize the reactor if required.

RV-2-02-71B has been declared inoperable because of a possible failed bellows.

Both Target Rock and GE have confirmed that this condition could incapacitate the pressure relief function of this valve.

The automatic and manual depressurization modes are not affected.

Therefore, even though RV-2-02-71B is an ADS valve, it is only inoperable with regard to Technical Specification 3/4.6.D.

Specification 3/4.5.E for the ADS-operability is not affected.

The setpoint for this valve is 1125 psig.

Presently, Technical Specification 3.6.D.2(a) allows for reactor operation with one inoperable SRV for 30 days.

As previously stated, an outage window is required to repair this valve.

Incorporation of this TS change will allow for continued reactor operation until the next outage of sufficient duration that requires a drywell entry.

Analyses were performed to determine the acceptability of continued reactor operation with only ten SRVs.

Four areas of concern were addressed:

MSIV closure overpressure transient, ATWS evaluation, LOCA analysis, and containment integrity.

The probability of an SRV as an accident initiator is not affected by this. inoperable SRV.

An MSIV closure Overpressurization Analysis was performed by PECo using NRC-approved analysis methods.

This analysis (Reference

2) assumed that two SRVs with a setpoint of 1125 psig were inoperable.

The results of this-analysis show that the maximum-ASME Code allowable pressure for the reactor of 1375 psig (upset condition) at the bottom head will not be exceeded during such an event.

This analysis indicates that a safety valve may potentially lift.

However, this ASME overpressure analysis-is conservative in that it does not include credit for the MSIV position switch scram.

A subsequent plant isolation overpressure analysis with two inoperable SRVs was performed which took credit for the functional position switch scram signal.

This analysis resulted in a peak vessel pressure of 1225 psig; and therefore the unpiped. safety valves will not open.

ATWS evfluations performed for Peach Bottom as part of the Power Rerate Program, concluded that reactor vessel peak pressure is 1495 psig, which is within the ATWS peak pressure requirements (ASME emergency condition).

In evaluating the ATWS analysis for the impact of'having one inoperable SRV, GE qualitatively determined the Power Rerate condition to conservatively bound the existing condition (i.e., 100% power, one SRV inoperable) based on evaluating the relative effects of steam flow and the rod line at which the analysis was performed.

.c

,Ex,1gant TSCR - PBAPS Unit 2 February 2, 1993 Docket. No. 50-277 Page 3 The Power Rerate ATWS analysis inputs were based on a steam flow / heat balance for 105% power.

This condition produces 776,000 lbm/hr (approximately 5.8%) more steam flow than the present rated condition.

An evaluation of the ATWS scenario for the present rated condition with one SRV inoperable indicates that the effective additional steam flow associated with the loss of this SRV is about 6.0%, which la approximately equal to the additional steam flow associated with the Power Rerate ATWS condition.

Furthermore, the Power Rorate ATWS analysis was performed at a more severe power / flow condition (MELLL -121% rod line) than the present plant power / flow condition (ELLL -108% rod line).

ATWS analysis results are significantly more severe when performed at higher rod line conditions.

Thus, it is demonstrated that an ATWS analysis for present plant conditions with one SRV inoperable would be bounded by the Power Rerate ATWS analysis, and would therefore be acceptable.

References 3, 4 and 5 provide inputs to_the above assessments.

The UFSAR LOCA analysis is unaffected by having only ten oporable SRVs.

For large break LOCAs, operation of SRVs is not required.

For small break LOCAs, the ADS is required to automatically depressurize the reactor vessel.

As previously stated, the ADS function of this valve has not been incapacitated in any way.

Therefore, plant responses to design-basis LOCAs are not impacted by having only ten operable SRVs.

The potential effects on primary containment were also evaluated.

Primary containment design parameters were based on conditions corresponding to a DBA LOCA.

Since SRVs would not be required to operate in a large break-LOCA condition, SRV operability doeL not impact containment integrity.

For the reasons stated above, continued reactor operation until the next outage of sufficient duration requiring drywell entry is acceptable with this SRV inoperable.

This mode of failure would not increase the probability of an SRV inadvertently opening because equalized pressure on each side of the bellows will prevent the first stage pilot from moving,-which in turn prevents the valve from opening.

If an SRV should inadvertently open, procedures are in place to either remedy the situation or shut down the-plant.

A stuck open SRV is an analyzed accident, and as stated in Reference 1, PECo has analyzed and taken measures to insure that adequate core cooling would be maintained with a stuck open SRV-under degraded conditions.

Information Supporting a Finding of No Significant Hazards i

The change proposed in this application does not constitute a significant hazards consideration in that:

1)

The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

,