ML20128D640
| ML20128D640 | |
| Person / Time | |
|---|---|
| Issue date: | 05/16/1985 |
| From: | Stello V Committee To Review Generic Requirements |
| To: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| AB43-2, AB43-2-106, NUDOCS 8505290148 | |
| Download: ML20128D640 (32) | |
Text
,
9,,
UNITED STATES g
[
g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20666 k.....
11AY 161985 MEMORANDUM FOR:
William J. Dircks Executive Director for Operations FROM:
Victor Stello, Jr., Chaiman Comittee to Review Generic Requirements
SUBJECT:
MINUTES OF CRGR MEETING NUMBER 74 The Committee to Review Generic Requirements (CRGR) met on Wednesday, April 17, 1985 from 1-5 p.m.
A list of attendees for this meeting is enclosed (Enclosure 1).
1.
J. Richardson and G. Arndt (RES) briefed the CRGR concerning a forthcoming proposed revision of 10 CFR Part 50, Appendix J. Primary for Water-Cooled Power Reactors.
Reactor Containment Leakage Testing (Category 2 Item). sumarizes this matter
'2.
R. Burnett (NMSS) presented for CRGR review, a proposal to revise NRC reporting and recordkeeping requirements and guidance concerning safeguards events. The proposal includes:
a)
Proposed amendments to 10 CFR Part 70, Domestic Licensing of.Special Nuclear Material; Part 73, Physical Protection of Plants and Materials; and Part 74, Material Control and Accounting of Special Nuclear Material.
b)
A conforming proposed Revision 1 to Regulatory Guide 5.62. Reporting of Physical Security Events. summarizes this matter (Category 2 Item).
3.
P. Norry (ADM)' presented for CRGR review, a proposed rulemaking to establish retention periods for recordkeeping requirements in 10 CFR Parts 4,11,21,25,30,31,32,34,35,40,50,60,61,70,71,-72,73,).
75, 95, 110 and 140. Enclosure 4 sumarizes this matter (Category 2 Item Enclosures 2 through 4 of this document contain predecisional infomation and therefore will not be released to the Public Document Room until the NRC has considered (in a public forum) or decided the matters addressed by the infor-mation.
NRYh
^ l,
F 2-MAY 161985 Questions concerning these meeting minutes should be referred to Walt Schwink (492-8639).
SIMl 1 =cd by C
71ctor Ste11o Victor Stello, Jr., Chairman Comittee to Review Generic Requirements
Enclosures:
As Stated cc: Commission (5)
SECY Office Directors Regional Administrators CRGR Members G. Cunningham J. Richardson G. Arndt R. Burnett P. Norry Distribution:
VStello JRoe ROGR Staff JHSniezek WLittle Central File RHernon EFox JPhilips JHenry RErickson ETriner JZwetzig FHebdon PDR(NRG/CRGR) b 0FC :ROGR/ 5
- ROGRfD
- D OGR
.p..-.---.:.
.---a...-..--
dW
+
f
- V 10
.v.-....../
M ezek NAME :
7.-..---.:---- -------:..........--:--.....-----:------------:-----.----.
DATE25)0/85 i5//585
- 5/lb/85
/
L
LIST OF ATTENDEES CRGR MEETING NO. 74 April 17, 1985 CRGR MEMBERS V. Stello R. Bernero E. Jordan W.Olmstead(forJ.Scinto)
T. Ippolito (for J. Heltemes)
D. Ross D. Chape11 (for R. Cunningham)
OTHERS Jim Sniezek Walt Schwink Jim Conran Jim Richardson Gunter Arndt Scott McNeil Jack Burns James Shapaker James Pulsipher l
John Huang Ed Shomaker Sid Feld Mat Taylor Don Kirkpatrick Ron Hernan W. Norris l
Hukam Garg Bob Burnett George McCorkle Ray Brady John Davidson Priscilla Dwyer Hazel Smith Nita Benson Don Nussbaumer l
Joe Felton John Philips 1
Chip Cameron Carl Feldman Phil McKee Jim Milhoan Melinda Malloy W. D. Altman i
s m.
y
-.--sr
+m
- - - - -- w 3
-e, n