ML20128D580

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Updated Fsar,Reflecting Changes Made to Facility Through 841231
ML20128D580
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/01/1985
From: Westafer G
FLORIDA POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20128D584 List:
References
3F0785-OL, 3F785-OL, NUDOCS 8507050147
Download: ML20128D580 (3)


Text

. _ _

ees 8,

(70k)OCI*

tomo T.c3,.

e Florida Power COR POR ATIO N July 1,1985 3F0785-01 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Final Safety Analysis Report, Revision 6

Dear Mr. Denton:

In compliance with 10CFR 50.71(e), Florida Power Corporation hereby submits one (1) signed original and twelve (12) copies of Revision 6 to the Crystal River Unit 3 Final Safety Analysis Report (FSAR). This document has been updated to reflect changes made to the facility through December 31,198tf. All FSAR figurer (e.g.,

302 series flow diagrams) have been revised as of April 23,1985.

Also included is a description and safety evaluation of a facility change made since January 1,1985 which resulted in a revision to the FSAR.

Sincerely, e

G. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management

$$b G3F/feb Enclosures 8507050147 850701 PDR ADOCK 05000302 K

FDR GENERAL OFFICE 3201 Thirty-fourth Street South a P.O. Box 14042, St. PetersburD, Florida 33733 e 813-866-5151

STATE OF FLORIDA COUNTY OF PINELLAS G. R. Westafer states that he is the Manager, Nuclear Operations Licensing and Fuel Management for Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

G. R. Westafer

/

Manager, Nuclear Operations Licensing and Fuel Management Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 1st day of July,1985.

A NotapfPublic Notary Public, State of Florida at Large, My Commission Expires: June 10,1986

f:e

(

i 3-0 j,,

1.

\\

ll is

).

Mar' 82-06-23-01, Comple' red 4/12/85 As a result of the transient of February 26,1980, at CR-3, it was necessary to reverify the adequa y of specific Nuclear Steam Supply System (NSSS) equipment.

4 No physical modificadon is required for this MAR.

p9 c

[

SAFETY EVALUATION y

q'

. 1.

Is the probability of an occurrence or the cr>nsequence of art accident or malfunction of equipment important to safety as previously evaluated in the s

Final Safety Analysis Report increased? YES NO x Because:

This is a' documentation change only which does not affect existing

/

equipment materially.

~

2.

Is the possibility for an accident or-malfunction of a different type than any previously evaluated in the Final Safety Analysis Report created?

YES NO x

Because:

1 No material cr operationbl parameters are being changed.

3.

Is the margin of safety, as defined in the l$1 sis for any Technical f

Specification, reduced? YES No x Because:

This is a documentation change only.

p,.

o i?

t e

q' I

4

\\

9

/

/.

k f

' ' ~

,u

/, y

  • I

)

t s

i F

8 f'

4 i

i t

t

. f f.

p d'