UNIT E3 ST ATEa:
p2Atog'*g.
NUCLEAR REGULATORY COMMISSION
p ..
MtotoN IV
g
611 HV AN PLAZA oRIVE, SuliE 400
ek,
AR LINGTON, T E X AS 760114044
q*****
FEB - I SGG
Oocket No. STN 50-482
License No. NPF-42
Wolf Creek Nuclear Operating Corporation
ATIN:
Bart D. Withers
President and Chief-Executive Officer
P.O.-Box 411
Burlington,' Kansas- 66839
Gentlemen:
SUBJECT: NRC INSPECT 0N REPORT 50-482/92-32 (NOTICE OF VIOLATION)
This letter refers to the inspection conducted by Messrs.
G.--A. Pick and other
inspectors identified in :the enclosed report- for the- period of November _22, .
1992, through January 2, 1993. The-Inspection included a review of activities
-
authorized for your-Wolf Creek Generating Station. . At the conclusion-of the
inspection, the findings were discussed with_those members of your__ staff-
identified in the enclosed report,
.
-
..
. - .
Areas examined during the inspection are' identified in the reporti Within-
these areas, tho. inspection-consisted of selective-examination of procedures
and representative records, interviews with personnel, and observations-of
activities in progress.
Based on the results of this inspection,: certain of your activities' appeared
i
-
to be-in violation of NRC requirements, as specified in the enclosed Notice of-
Violation (Notice).
Violation A pertains to the failure of a mechanical ~
maintenance worker to follow work instructions while disassembling.a spent
fuel pool cooling pump (Section 3.4),: This violation 41s of concern because it
is:an additional example of maintenance-personnel deviating from their work
instructions without stopping work untti the work instructions are-
appropriately revised.- Violation B pertains to an inadequate spent. fuel pool
'
bridge crane operating procedure _ (Section .7.3).'
This violation;ist of concern
_
because there were no procedural precautions toLinform the bridgo crane.-
operators to not position heavy loads over spent. fuel-assemblies.
The licensee; identified an-instance:of failure to follow' the new fuel! receipt
procedure.resulted in the potential damage of a:new fuellassembly. This-
violation of Technical S)ecification 6.8.1.a for: failure to follow,an; approved
procedure was r.ot cited )ecause the criteria-identified in paragraph.VII.B,2
of;10-CFR 2, Appendix C (Enforcement Policy),1were_ satisfied. The licensee:
-
'took prompt and effective: corrective actions to prevent 1 recurrence-
(Section 2.2).
_
-
- - .
_ _ _ _ _ _ _ _ . _ _ _
_ ___
_ - _7l
.
. - _ .
.
-
.-
_-
_ _
_ ..
. ..
.
.
Wolf Creek Nuclear Operating
-2-
Corporation
You are required to respond to this letter and should follow he instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980. Pub. L. No.96-511.
Should you have any questions concerning thir. inspection, we will be pleased
to discuss them with you.
Sincerely,
I
I.BillBeach, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-482/92-32 w/ attachment
cc w/ enclosure
Wolf Creek Nuclear Operating Corp.
ATTN: Otto Maynard, Director
Plant Operations
P.O. Box 411
Burlington, Kansas 66839
Shaw, Pittman, Potts & Trowbridge
ATTN: Jay Silberg, Esq.
2300 M Street, NW
Washington, D.C.
20037
Public Service Commission
ATTN:
C, John Renken
Policy & Federal Department
P.O. Box 360
Jefferron City, Missouri
65102-
- .
_._ _ _ __
_ _ . _ _ . - - . - _ _
_. -_ _ __ _ ____ _ _ ._ _ ._._ ___ _ _
'
!
i
~
.
Wolf Creek Nuclear Operating
-3-
Corporation
!
U.S. Nuclear Regulatory Commission
ATTN:
Regional Administrator, Region 111
799 Roosevelt Road
.
Glen Ellyn, Illinois 60137
Wolf Creek Nuclear Operating Corp,
,
A1TH: Kevin J. Moles
Hanager Regulatory Services
P,0, Box 411
)
Burlington, Kansas 66839
'
Kansas Corporation Commission
ATTN:
Robert Elliot, Chief Engineer
Utilities Division
1500 SW Arrowhead Rd,
Topeka, Kansas 66604-4027
Office of the Governor
State of Kansas
Topeka, Kansas 66612
Attorney General
1st floor - The Statehouse
l
Topeka, Kansas 66612
Chairman, Coffey County Commission
Coffey County Courthouse
Burlington, Kansas 66839-1798
Kansas Department of Health
and Environment
Bureau of Air Quality & Radiation
Control
4
ATTN: Gerald Allen, Public
Health Physicist
Division of Environment
forbes field Building 321
Topeka, Kansas 66620
Kansas De)artment of Health and Environment
A11N:
Ro)ert Eye, General Counsel
LS0B, 9th floor-
900 SW Jackson
Topeka, Kansas 66612-
_
, _ - -.
.
_ _ - . _ . _ . .
.
._
..
_,
_ . . -
__ _ . -
.
.
FEB - 1 1993
Wolf Creek Nuclear Operating
-4
Corporation
bec to DMB (IE01)
bec distrib. by RIV:
J. L. Milhoan
Resident inspector
Section Chief (DRP/D)
DRSS-FIPS
Section Chief (Rill, DRP/3C)
RIV file
SRI, Callaway, Rill
MIS System
Lisa Shea, RM/ALF, MS: Mi4BB 4503
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
J. Tapia, SR1, STP
G. A. Pick, SRI. WC
RIV:Rl:DRP/D
SRI:DRP/0f,v
PE:DRP/RS
C:DRP/D W
QhRPt
LEMyers:sa
GAPic[b
MASator(uIfN ATHoweN
Aklbhi
01/12/93
1/1],/93
1/9(/93
1/%/93
1/% /93
_
-
Y
,
,
_ - - _ _
-_
__
j
n
f.
~I
Wolf Creek Nuclear Operating
-4-
Corporation
bec to DMB (IE01)
'
bcc distrib. by RIV:
J. L. Milhoan
Resident inspector
Section Chief (DRP/D)
l
DRSS-FIPS
Section Chief (Rlli, DRP/3C)
!
RIV File
SRI, Callaway, Rill
MIS System
Lisa Shea, RM/ALF, MS: MNBB 4503
Project Engineer (DRP/0)
Section Chief (DRP/TSS)
G. A. Pick, SRI, WC
RIV:RI:DRP/D
SRl:DRP/Q L
PE:DRP/Mk
C:DRP/D Y
00RPt
LEMyers:sa
GAPic[5
MASatorfukiF ATHoweh
Abhi
01/12/93
1/_g, /93
1/9l/93
1/d6/93
1/% /93
04000G