Forwards Insp Repts 50-482/84-57 & 50-482/85-11 on 841001-1220 & Feb 1985,respectively & Notice of Violation & Proposed Imposition of Civil Penalty.Similiar Weaknesses Previously Noted Discussed
ML20128D385
Person / Time
Site: Wolf Creek 
Issue date: 05/08/1985
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Koester G
KANSAS GAS & ELECTRIC CO.
Shared Package
ML20128D390 List:
References
EA-85-027, EA-85-27, NUDOCS 8505290054
Download: ML20128D385 (5)


See also: IR 05000482/1984057

Text

-,y

-

63

=

JAM 0 815

-Dockets:

STN 50-482/84-57

STN 50-482/85-11

EA 85-27

Kansas Gas and Electric Company

ATTN: -Glenn L. Koester

Vice President - Nuclear

P.' O. Box 208

Wichita, Kansas 67201

Gentiemen:-

This refers to the routine inspections of activities authorized by NRC Construction

Permit No. CPPR-147 conducted by Mr. W. G. Guldemond and other members of the Wolf

Creek Task Force including Messrs. M. Farber and D. Williams of the Region III

office. These two inspections were conducted under the preoperational test

inspection program during the periods of October 1 - December 20, 1984 and

February 1 - 28, 1985 at the Wolf Creek Generating Station. The results of

these inspections were discussed with you and members of your staff at an

Enforcement Conference held at the Wolf Creek site on December 4, 1984, which

was attended by Mr. R. P. Denise and other members of the NRC staff, and with

Mr. C. Mason and other members of your staff at an Exit Meeting on February 28,

1985.

During these inspections, violations of NRC requirements were identified. These

violctions indicated weaknesses in your preoperational test program.

Violation IA-

in the enclosed Notice of Violation and Proposed Imposition of Civil Penalty

involves three examples which your test program failed.to provide verification

of design safety features. Violation IB involves two examples in which your

test program failed to demonstrate component performance during limiting accident

conditions under which the component is expected to operate. Violation IC

involves three examples in which your test program failed to ensure the use of

proper testing methods and proper equipment. Violation ID involves one example

in which your test program failed to verify a design document commitment.

Previous ' Inspection Reports identified similar weaknesses (Inspection Reports

50-482/84-15,50-482/84-20,and50-482-84-30).

Failures to properly execute

procedures and to properly document test discrepancies had been identified

previously.

In addition, during previous inspections we found a number of

completed preoperational test packages that were voided during the final review

stages due to administrative errors. These violations and other concerns

involving your failure to provide adequate acceptance criteria and to adequately

evaluate anomolous test results were discussed with you previously.

Since similar

violations were identified subsequently, it appears that your initial actions were

to resolve these weaknesses on a case-by-case basis rather than in a comprehensive.

manner.

Insufficient management attention was devoted to identifying and correcting

the root causes of these problems. As a result, as documented in-NRC Inspection

CERTIFIED MAIL

RETURN RECEIPT REQUESTED

~

8505290054 850508

'

PDR

ADOCK 05000482

O

S

G

PDR

_

_. -

1$u

Kansas Gas and Electric Company

-2-

Report 50-482/84-57, these violations and concerns indicated.that a breakdown

in the execution of your preoperational test program occurred.

To emphasize the importance the NRC places on the execution of your preoperational

test program to ensure that the program demonstrates the functional capabilities'

of structures, systems, and components, and after-consultation with the Director,

Office of Inspection and Enforcement, I have been authorized to issue the enclosed

Notice of Violation and Proposed Imposition of Civil Penalty in the amount of

Twenty-Five Thousand Dollars ($25,000). This violation has been categorized as

a Severity Level III violation in accordance with the " General Statement of Policy

and Procedure.for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985).

The base value for this type of violation is $50,000. However, the Enforcement

Policy permits the consideration of factors for mitigation or escalation of the

. proposed penalty. The staff reviewed these factors and determined that

mitigation of the base penalty by 50% was warranted. While we recognize

that your initial actions were limited in scope, we also recognize that you

have taken the prompt and extensive corrective actions you described during the

Enforcement Conference on December 4,1984 and in your letters of December 11,

1984 and February 5,1985. These corrective actions have been reviewed and

found to be satisfactory (as documented in paragraph 2 of enclosed Inspection

Report 50-482/85-11).

Three other violations identified in Inspection Report 50-482/85-11 and discussed

in the enclosed Notice are not assessed a civil penalty. Violation IIA involves

three failures to follow plant administrative procedures. Violation IIB involves

a failure to follow a preoperational test procedure, and Violation IIC involves

a failure to operate the plant to procedural requirements. These violations are

categorized as Severity Level V violations.

You are required to respond to the violations and should follow the instructions

in the Notice when preparing your response. Your response to the enclosed Notice

should address these items and provide an updated status on completion of those

items described in your December 11, 1984 letter. Your response should also

address specifically the corrective actions which you discussed with the Region IV

staff and which you have implemented to preclude recurrence of this type of

violation during the power ascension and operation phases at Wolf Creek. You

may reference previous correspondence concerning these violations.

In accordance with Section 2.790 of the -NRC's " Rules of Practice," Part 2,

Titic 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

The response directed by this letter and the accompanying Notice .is'not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

-

.

-

.

.

.-.

-

,_

,3~

.s

Kansas Gas and Electric Company

-3-

~Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.:

Sincerely,

I

Orignal signed BY.

Pauls. Check

Robert D. Martin

Regional Administrator

Enclosures:

1.

Notice of Violation and Proposed

Imposition of Civil Penalty

2.

Appendix A - NRC Inspection Report

50-482/84-57

3.- Appendix B - NRC Inspection Report

50-482/85-11-

-cc:

' Kansas Gas and Electric Company

ATTN: Gene P. Rathbun, Manager

of Licensing

P.~ O. Box 208

Wichita, Kansas 67201

Forrest Rhodes, Plant Superintendent

Wolf Creek Generating Station

P. O. Box 309

Burlington, Kansas

66839

>

Kansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV
  • RPB2

Myron Karman, ELD, MNBB (1)

  • Resident Inspector

R. D. Martin,.RA

  • Section Chief (RPB2/A)

R. P. Denise,

' EP&RPB

J. Harrison, RIII

  • RIV. File
  • MIS System
  • RSTS Operator
  • D. Weiss, LFMB (AR-2015)

T. Westerman

  • w/766

,

,

/20/

-

f

,-v-

-

-

-

b

.s

5

.a

- Notice'of Violation

-6-

Kansas Gas and Electric Company

~

Distribution

PDR

LPDR

SECY

,

ACRS

CA

JTaylor, IE

- RVollmer, IE

RMartin, RIV

JAxelrad, IE

JCollins, IE

BBeach,~ IE

JLieberman, ELD

VStello, DED/ROGR

FIngram, PA

BHayes, OI

SConnelly, OIA

JCrooks, AE00

HDenton, NRR

Enforcement Coordinators

RI, RII, RIII, RIV, RV

EJordan, IE'

BGrimes, IE

JPartlow, IE

<

-BSummers,IE(letterhead)

ES File

EA File

EDO RDG File

DCS

IE:ES

ELD

RIV

ES:D

IE:DD

IE:D

BBeach

JLieberman

RMartin

JAxelrad RVollmer JTaylor

4/ /85

/ /85

/ /85

/ /85

/ /85

/ /85

RIV-RPB2/

.DRSP

RC /

E0 I

LEMartin

RPDen se

WBfown~

TFWesterman

in

f/ddf85-

A $/85

f////85

4/c/85

85

'

.

-w

-

y

,

,,m.

-

. . _ . . . . .

-

--

- _ - - - -

,

-

,.

h.

.

Notice of Violation

-9-

Kansas Gas and Electric Company

Distribution

PDR

LPDR

SECY

ACRS

CA

JTaylor. IE

RVo11mer, IE

RMartin, RIV

JAxelrad. IE

JCollins IE

BBeach, IE

JLieberman, ELD

VStello, DED/ROGR

FIngram, PA

-BHayes. 01

SConnelly, DIA

JCrooks, AEOD

HDenton, NRR

Enforcement Coordinators

RI, RII, RIII, RIV. RV

EJordan IE

BGrimes, IE

JPartlow, IE

BSummers IE(letterhead)

ES File

EA File

EDO RDG File

DCS.

IE:E

. ELD

RIV[6 M,

IE

BBea

JLi erms

RMartin

J

d

mer -

or

8

4/g85 4 4 /$854

4/2$/8

85

/85

M5

4D

'b

-

m,

e,m

in-1savisea-aan

11:s1

se re se :

-