ML20128D228
| ML20128D228 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/03/1993 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20128D229 | List: |
| References | |
| NUDOCS 9302100086 | |
| Download: ML20128D228 (4) | |
See also: IR 05000298/1993001
Text
]
.'
pano,
UNITED STATES
v
f.-
fg
NUCLEAR REGULATORY COMMISSION
i
i
REGloN IV
y
o,
'[
611 RYAN PLAZA ORIVE, SUITE 400
<<
t'
AR LING TON, TE XAS 7601 F8064
+....
pg _e s93
.
Docket:
50-298
License:
<
Nebraska Public Power District
ATTH:
Guy R. Horn, Nuclear Power
Group Manager
P.O. Box 499
Columbus, Nebraska 68602-0499
"
SUBJECT:
NRC INSPECTION REPORT 50-298/93-01
This refers to the inspection conducted by an NRC team from Region IV
accompanied by the NRR Project Manager on January 4-8, 1993.
The inspection
'
included a review of activities authorized for your Cooper Nuclear Station
facility. At the conclusion of the inspection, the findings were discussed
with you and those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. These
areas included reviews of modifications and design change packages, interviews
with personnel, and reviews of quality assurance audits and assessments of the
engineering and technical support organization. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observation of activities in progress.
The results of this inspection are documented in the enclosed report.
It is cur understanding that, during the exit meeting conducted on January 8,
1993, you made two commitments to enhance the control of plant temporary
,
modifications. The first commitment was to annotate control room drawings and
procedures to indicate that a temporary modification affects those documents.
The second commitment was to review the present temporary design changes to
determine if any could be made permanent plant modifications.
If your
understanding of thest commitments differs from ours, please contact me
immediately.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and its enclosure will be placed in the NRC Public Document
Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
[d$m
Samuel J. Collins, Director
Division of Reactor Safety
Enclosure:
(see .iext page)
I
ADOCK 05000298
-/ .{ }
9302100096 930203
/
I
O
/ 7
U
-.
.-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _
_-
=i
r
~
Nebraska Public Powa; vistrict
-2-
Enclosure:
Appendix - NRC Inspection Report
50-298/93-01 w/ Attachments
cc w/ enclosure:
Nebraska Public Power District
ATTN:
G. D. Watson, General Counsel
P.O. Box 499
Columbus, Nebraska 68602-0499
Cooper Nuclear Station
ATTH: John M. Meacham, Site Manager
P.O. Box 98
Brownville, Nebraska 68321
Nebraska Department of Environmental
Control
ATTH: Randolph Wood, Director
P.O. Box 98922
Lincoln, Nebraska 68509-8922
Nemaha County Board of Commissioners
ATTN: Richard Moody, Chairman
Nemaha County Courthouse
1824 N Street
Auburn, Nebraska 68305
Nebraska Department of Health
ATIN: Harold Borchert, Director
Division of Radiological Health
301 Centennial Mall, ' South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
Kansas Radiation Control Program Director
__
. _ _ - _ _ _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -
-
..
..-
1
i
Nebraska Public Power District
-3-
bec to DMB (IE01)
bec distrib. by RIV:
'
J. L. Milhoan
Resident Inspector
Section Chief (DRP/C)
.
MIS Systen
Lisa Shea, RM/ALF, MS: MNBB 4503
DRSS-FIPS
Section Chief (DRP/TSS)
RIV File
R. P. Mullikin
T. F. Westerman
R. K. Frahm, JR.
P. A. Goldberg
M. F. Runyan
R. B. Vickrey
Senior Resident Inspector - River Bend
Senior. Resident Inspector - Fort Calhoun
_
RIV:ATL TSS*
RI:ES*
RI:ES*
RI:ES*
RI:ES*
Rit111 kin
RKFrahm
PAGoldberg
MFRunyan
RBVickrey
,
01/27/93
01/27/93
01/26/93
01/27/93
01/26/93
C:ES Y
D:DRS
D:0@f/2m-
0:DRS Y
,
TfWesterman
IBarnes # d
ABBeach
SJCollins .
Z
/ /27/_93
i /2t/93
,7-/
/93
2- / 3 /93
- Previously concurred
!
- -
_ _ - _ - - - _ - - - - . - _ - -
. . __
-- . - _ - _ _ _ _ _ _ _ _
1
A
,
Nebraska Public Power District
-3-
6
>
bec to DM8 (IE01)
bec distrib. by RIV:
,
J. L. Milhoan
Resident Inspector
Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: HNBB 4503
MIS System
DRSS-FIPS
Section Chief (DRP/TSS)
RIV File
R. P. Mullikin
T. F. Westerman
R. K. Frahm, JR.
P. A. Goldberg
M. F. Runyan
R. B. Vickrey
Senior Resident Inspector
River Bend
Senior Resident Inspector - Fort Calhoun
1
J
_
RIV:ATL:TSS*
RI:ES*
RI:ES*
RI:ES*
RI:ES*
l RPMullikin
RKFrahm
PAGoldberg
MFRunyan
RBVickrey
!01/27/93
01/27/93
01/26/93-
01/27/93
01/26/93
C:ES T
D:DRS
D:05[P1 M m D:DRS M_
TFWesterman
IBarnes M ABBeach
SJCollins
1 93
! /27/93
i /2?/93
7. /
- Previously concurred
__
2- / 3 /93
/
/
08000
1
-> . . .
_ . _ _ _ _ . _ _ _ _ _ _ _ . _ _ . _ _ _ _ . _ _ _ _ _ _ _ . . . . _ . _
]
I
-