ML20128D033

From kanterella
Jump to navigation Jump to search
Forwards Draft Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28...,Item 1.2, 'Post-Trip Review:Data & Info Capabilities'.... NRC Manager Should Be Informed of Acceptable Time for Telcons Re Addl Info
ML20128D033
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/10/1985
From: Varga S
Office of Nuclear Reactor Regulation
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20128D037 List:
References
GL-83-28, NUDOCS 8505280485
Download: ML20128D033 (3)


Text

,___ .,

May 10, 1985 Docket Nos. 50-348 ,. DISTRIBUTION and 50-364 h oocket F11e d NRC PDR L PDR ORB #1 Rdg HThompson OELD EJordan BGrimes JPartlow EReeves ABournia JKramer Mr. R. P. Mcdonald ACRS / O ORB 1 Gray CParrish Senior Vice President Alabama Power Company

' Post Office Box 2641 Dirmingham, Alabama 35291

Dear Mr. Mcdonald:

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT (TER) FOR ITEM 1.2 0F GENERIC LETTER 83-28 FOR JOSEPH M. FARLEY NUCLEAR PLANT UNITS 1 AND 2 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Item 1.2. The enclosed Draft TER represents the staff's initial judgment of the areas evaluated. Pen and ink changes have been made to the TER for consistency.

In order to maintain our present review schedule, we would appreciate your cooperation in obtaining additional information that will pennit us to complete our review. It would appear that the needed information on your facility could be obtained by telephone conference within one week of your receipt of the Draft TER. The assigned NRC Project Manager should be

' advised of an acceptable 'ti'm e to conduct the necessary conference calls.

This telephone conference would then be followed up by a submittal documenting the results. -Our. final evaluation would follow shortly thereafter.

TherepNtingand/orrecordkeepingrequirementsofthisletteraffectfewer

.than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

/s/SVarga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing

Enclosure:

Draft TER on Salem ATWS Item 1.2 cc w/ enclosure:

See next page-

  • See previous white for c ny rrence y ORB #1:DL* ORB #1 f- -

B#1:DL CParrish EReeves;ps Var. a 5/7/85 5/f785 5p 8505280485 850510 PDR ADOCK 05000348 P PDR

Docket Nos. 50-348 DISTRIBUTION and 50-364 Docket File NRC PDR L PDR ORB #1 Rdg HThompson OELD EJordan BGrimes JPartlow EReeves ABournia JKramer Mr. R. P. Mcdonald ACRS ORB 1 Gray CParrish /

Senior Vice President Alabama Power Company Post Office Box 2641 Binningham, Alabama 35291

Dear Mr. Mcdonald:

SUBJECT:

-DRAFT TECHNICAL EVALUATION REPORT (TER) FOR ITEM 1.2 GENERIC LETTER 83-28 FOR JOSEPH M. FARLEY NUCLEAR P NT UNITS 1 AND 2 The staff has completed a preliminary review to assess t completeness and adequacy of licensee responses to Generic Letter 83-28 em 1.2. The' enclosed Draft TER represents the staff's initial jud nt of the areas evaluated. Pen and ink changes have been made to th .TER for consistency.

In order to maintain our present review schedule, e would appreciate your cooperation in obtaining additional information hat will permit us to complete our review. It would appear that th needed information on your facility could be obtained by telephone conf ence-within one week of your receipt of the Draft TER. The assigned NR roject Manager should be advised of an acceptable time to conduct e necessary conference calls.

The reporting and/or recordkeeping re irements of this letter affect fewer than ten respondents; therefore, OMB learance is not required under P.L. ,96-511.

Sincerely, Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing

Enclosure:

Draft TER on Salem ATWS Item 1.2 cc w/ enclosure:

See next page ORB #1:DL ORB  : BC-ORB #1:DL CParrish EReeves;ps SVarga 5/y/85 5 /85 5/ /85

l l

.. Mr. R. P. Mcdonald Joseph M. Farley Nuclear Plant Alabama Power Company cc: Mr. W. O. Whitt D. Biard MacGuineas, Esquire Executive Vice President Volpe, Boskey and Lyons Alabama Power Company 918 16th Street, N.W.

Post Office Box 2641 Washington, DC 20006 Birmingham, Alabama 35291 Charles R. Lowman Mr. Louis B. Long, General Manager Alabama Electric Corporation Southern Company Services, Inc. Post Office Box 550 Post Office Box 2625 Andalusia, Alabama 36420 Birmingham, Alabama 35202 Dr. J. Nelson Grace Houston County Comission Regional Administrator - Region II Dothan, Alabama 36301 U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, GA 30303 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge Ira L. Myers , M.D. ,

1800 M Street, N.W. State Health Officer Washington, DC 20036 State Department of Public Health State Office Building Chairman Montgomery, Alabama 36130 Houston County Commission Dothan, Alabama 36301 Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 24 - Route 2 Columbia, Alabama 36319 State Department of Public Health ATTN: State Health Officer State Office Building Montgomery, Alabama 36104

. .__ _ _ __ _