OPERATING DATA REPORT Docket No.-

50-271 Date 850510 Completed by F.J. Burger Telephone (802)257-7711 OPERATING STATUS Notes:

1. " Unit Name: Vermont Yankee 2.

Reporting Period:

April c3.: Licensed Thermal Power (MWt):

1593

~4.' -Nameplate 1 Rating-(Gross MWe):

540

5. - Design Electrical Rating (Net MWe):-514(OC)504(CC) 6.

Maximum Dependable Capacity (Gross MWe):

535

7. iMaximum Dependable Capacity (Net MWe):

504

' 8.

(If changes occur in capacity ratings (Items Number 3'through 7) since last report, give reasons:

N/A

9.. Power level to which restricted, if any-(Net MWe):

N/A 10.~3 Reasons for restrictions, if any:

N/A l

This month Yr-to-Date Cumulative 111. Hours in Reporting Period 719.00

- 2879.00 12.' Number'of. Hours Reactor was Critical 719.00 2863.97 89677.90 13.' Reactor Reserve Shutdown Hours 0.00 0.00-0.00 14.. Hours Generator On-Line 719.00-2858.55 87288.62

15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH)
1133833.50 4496604.00 127055613.50
17. Gross ~ Electrical Energy Generated (MWH) 383244.00 1523790.00-42313538.00
18. Net Electrical Energy Generated (MWH).

367063.00 1460724.00-40161572.00

19. Unit Service Factor 100.00 99.29 78.98 20.lUnit Availability Factor 100.00 99.29 78.98 l21. Unit Capacity Factor (using MDC Net) 101.29 100.67 72.10'
22. Unit Capacity Factor (using DER Net) 99.32 98.71

-- 70.70

+

i

23.. Unit Forced Outage Rate 0.00

.71 7.17 24.~ Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):

Refuelina outaae scheduled to start September 14, 1985 and continue to April 26, 1985.

25. If shut down at end of~ report period, estimated date of startup: N/A 26.' Units in Test Status (prior to commercial operation):

Forecast Achieved Initial Criticality Initial Electricity Commercial Operation MSR.F1 4

9lI 8505280405 850430

.c6 I

PDR ADOCK 05000271 y'

R PDR p.g-,c-i...

+9 4

p.

g 9%y

-y

,.c,p---

--9 m-

,-q-e--y

,*-gm.---,

m9%-a

-,eg-y y

y--

-.3,.-.,-

t i

7 AVERAGE DAILY LNIT POWER LEVEL Docket No.

50-271-1,,'-

Unit -- Vermont Yankee.

-Date 850510 Completed by F.J. Buraer

-Telephone -(802)257-7711 MONTH. JApril' i-DAY ~ AVERAGE DAILY' POWER. LEVEL.

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)-

(MWe-Net) 1-l' 516 17 515

'21 516 18 515 3

~517

- 19 516

'4 '

-517 20 516 5:

516 21 498 I

'6 517-22' 516 i-l.

17.

511 23 514 8

516 24 -

513' '

i'

9-516 25 514 j-10 494

~26 513

' ll 491 27 513 Y

- 12 515 28 505*

13

'515 29 513 14 454 30 515 i

15 515 31 ra

[l 16 515

  • 23 hour day INSTRUCTIONS:

On_this format, list the average daily unit power level in W e-Net for each day i

. in the reporting month. Compute to the nearest whole megawatt.

~ MSR.F2 i

e

~... -.,..., -..

...,.__.--.,,-4,_,-#,

._,.._...~,.,_..,._,r_-_-

,,.,.,-,,,..-,__,..,,,.i,,y

' Dock t Noi 50-271-Unit Vermont Yafkee-UNIT SHUTDOWNS 'AND POWER REDUCTIONS Date -850510

, Completed by F.J. Burger-REPORT K) NTH

' April Telephone (802J257-7711:

1.

2 3

4 5

~.

No.

Date Typed Duration Reason Method of License System Component Cause and Corrective Action _to-(hours)

Shutting Down Event-Code Code Prevent Recurrence Reactor Report #

85-07 850414 S

0 B

.4 N/A RB CONROD Power reduction for surveillance and a control rod pattern I~

(Power Reduction) adjustment.

1 2

3 4-F-Forced A-Equipment Failure (Explain)

Method Exhibit G Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event 3-Automatic Scram Report (LER)' File (NUREG 0161)

D-Regulatory Restriction 4-Other (Explain)-

E-Operator Training and License Examination.

F-Administrative 5

G-Operational Error (Explain).

. Exhibit I - Same. Source H-Other (Explain)

MSR.F3

re 1 g 1 r 7 N

u 7 O

e B

I 1' e 7

T 7

k

. 5 C

2 n

J. )2 A

T a D Y F

2 E

5 0

0 V

t 1

8 I

n 5 y(

T o 0 b_

C

.m 5 E

or 8 de R

Ne en R

V t; o O

t th C

~

l p ktape cit on:ml oe DUDCT T

LU SER NO IT CNU FLAM ESU AC EG E

A C

T N

U A

OR N

E E

RB T

O4 N

J I

RF A

E

.M L

.DE T

E

.A FC L

ON E

A R

EN RE Y

UT T

TN

.E AI

.F NA M

A

.S TN E

P IUQ E

4 F.

R SM

=_ _

?

--Docket No.- 50-271 Unit Vermont Yankee Date-850510 Completed by F.J. Burger Telephone (802)257-7711-REPORT MONTH April SLM MRY 0F OPERATING EXPERIENCES

- Highlights Vermont Yankee operated at98.9% of rated thermal power for the month. Gross electrical generation was 383,244 MWH or 98.7 % of design electrical e

capacity.

Operatina Summary The following is a chronological description of plant operations including-other pertinent items of interest for the months 4

- At the beginning of the reporting period the plant was operating at 99.9% of

. rated-thermal power.

850414 At 0030 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> a power reduction was initiated for surveillance testing and control rod pattern adjustment..

850414 At 0215 hrs a return to full power was initiated.

At the end of the reporting period the-plant was operating at 99.9% fo rated thermal power.

MSR.F5

VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUh"r ROAD VERNON, VERMONT 05354 VYV 85-267 May 10, 1985 U. S. Nuclear Regulatory Commission

- Director, Office of Management Information and Program Control Washington, D. C.

20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of April,1985.

Very truly yours, VERMONT Yare (EE NUCLEAR POWER CORPORATION d*ss--f

  • /

Warren P'. Murphf Vice President an Manager of Operations WPM 8JB/pd:MSR1.1 56 f

'll

E.,

i fi I

j-I e.

l I

w I

3...

+

s-VERMONT YAt4(EE NUCLEAR POWER STATION 1

4 MONTHLY STATISTICAL REPORT 85-04 FOR-THE MONTH OF APRIL,-1985 t.