Forwards Safety Insp Repts 50-266/85-05 & 50-301/85-05 on 850506-09 & Notice of Violation.Noncompliance Re Capability of Shift Superintendents to Make Adequate Protective Action Recommendation Is Repeat Noncompliance
ML20128C483
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/22/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20128C486 List:
References
NUDOCS 8505280305
Download: ML20128C483 (2)


See also: IR 05000266/1985005

Text

m

.

.,

MAY 2 2 085

' Docket No. 50-266

'

Docket No. 50-301

Wisconsin Electric Power Company

ATTN:

Mr. C. W. Fay

Vice Presidenti

Nuclear Power Department

231 West Michigan, Room 308

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. Snell and

others of this office on May 6-9, 1985, of activities at the Point Beach

Nuclear Plant _ authorized by NRC Operating License'Nos. DPR-24 and DPR-27 and

to the' discussion of our findings with Mr. 'J.

Zach and others of your staff

-

at the conclusion of the inspection.

The enclosed copy.of our inspection report identifies _ areas. examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this. inspection,~ certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix A.

A written response is required.

It is noted that.the noncompliance, which concerned the capability of the -

' Shift Superintendents to make an adequate protective action recommendation,.

is a repeat noncompliance from the July 23-27, 1984 routine emergency

preparedness inspection (IE Report Nos. 50-266/84013; 50-301/84011). _ This

tis to confirm the commitment made by licensee representatives at the exit

meeting on May 9, 1985, that prompt corrective action concerning this repeat

noncompliance would be taken by revising applicable procedures within two

weeks and retraining all Shift Superintendents within one additional week

from the date of-the exit meeting.

-Weaknesses identified during this inspection which should be corrected by your

staff are summarized in the attached Appendix B to this letter.

Please advise

us within 45 days of the date of this letter of the actions you plan to.take

showing the estimated date of completion, with regard to these weaknesses.

.In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

'this. letter and the enclosures will be placed in the NRC Public Document

. Room.

1NI

i

I

hE

oIb

.i

t

i

u

r

.

,

-Wisconsin Electric Power Company

2

WY 2 2g

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

r

'

C.'J. Pap ,fello, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

Appendix B, Emergency

Preparedness Weaknesses

3.

Inspection Reports

No. 50-266/85005(DRSS);

No. 50-301/85005(DRSS)

cc w/encls:

J. J. Zach, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin PL:blic Service

Commission

W. Weaver, FEMA, Region V

D. Matthews, EPB, OIE

kiw