' Docket No. 50-266
'
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. C. W. Fay
Vice Presidenti
Nuclear Power Department
231 West Michigan, Room 308
Milwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by Mr. W. Snell and
others of this office on May 6-9, 1985, of activities at the Point Beach
Nuclear Plant _ authorized by NRC Operating License'Nos. DPR-24 and DPR-27 and
to the' discussion of our findings with Mr. 'J.
Zach and others of your staff
-
at the conclusion of the inspection.
The enclosed copy.of our inspection report identifies _ areas. examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this. inspection,~ certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix A.
A written response is required.
It is noted that.the noncompliance, which concerned the capability of the -
' Shift Superintendents to make an adequate protective action recommendation,.
is a repeat noncompliance from the July 23-27, 1984 routine emergency
preparedness inspection (IE Report Nos. 50-266/84013; 50-301/84011). _ This
tis to confirm the commitment made by licensee representatives at the exit
meeting on May 9, 1985, that prompt corrective action concerning this repeat
noncompliance would be taken by revising applicable procedures within two
weeks and retraining all Shift Superintendents within one additional week
from the date of-the exit meeting.
-Weaknesses identified during this inspection which should be corrected by your
staff are summarized in the attached Appendix B to this letter.
Please advise
us within 45 days of the date of this letter of the actions you plan to.take
showing the estimated date of completion, with regard to these weaknesses.
.In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
'this. letter and the enclosures will be placed in the NRC Public Document
. Room.
1NI
i
I
hE
oIb
.i
t
i
u
r
.
,
-Wisconsin Electric Power Company
2
WY 2 2g
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
r
'
C.'J. Pap ,fello, Chief
Radiological Protection Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
Appendix B, Emergency
Preparedness Weaknesses
3.
Inspection Reports
No. 50-266/85005(DRSS);
No. 50-301/85005(DRSS)
cc w/encls:
J. J. Zach, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin PL:blic Service
Commission
W. Weaver, FEMA, Region V
D. Matthews, EPB, OIE