DUKE POWER Gox P.O. Box 33180 CHARLOTTE, N.o. 2824
[
HAL B. TUCKER
[
vra.epinon Og,g (704) 373-4338 April 24, 1985 g
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900
. Atlanta, Georgia 30323 RE: Catawba Nuclear Station, Unit 2 Docket No. 50-414 Significant Deficiency No. 414/84-18 Significant Deficiency No. 414/84-19
Dear Dr. Grace:
Both of these Significant Deficiencies involve the Diesel Generato1 Engines on Unit 2 and will require disassembly to replace piston skirts too subcovers.
This process will take approximately two months for each engine and must be done at separate times due to testing requirements. The commitment date of August 1,1985, for completion of this work cannot be met, since the work for Engine 2B cannot begin until July 1, 1985. The completion date, therefore, for corrective action on both of these items should be extended to January 1, 1986. All work will be completed at that time.
Very truly yours,
(
Hal B. Tucker LTP/mjf cc: Director Mr. Robert Guild, Esq.
Office of Inspection and Enforcement Attorney-at-Law U. S. Nuclear Regulatory Commission P. O. Box 12097 Washington, D. C. 20555 Charleston, S. C. 29412 NRC Resident Inspector Mr. Jesse L. Riley Catawba Nuclear Station Carolina Environmental Study Group Palmetto Alliance 854 Henley Place 21351s Devine Street Charlotte, North Carolina 28207 Columbia, South Carolina 29205 INFO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 OmdAC COPY.
g#dfM 8505280042 850424 PDR ADOCK 05000414
/
S PDR
\\
I;O