ML20128B630

From kanterella
Jump to navigation Jump to search
Deficiency Rept DER 85-07 Re Lack of Bolt Nut Retention Mechanism on C-E Instrument Rack Design.Initially Reported on 850305.Unit 1 Rack Bolting Satisfactorily Qualified.Final Rept Delayed Until 850712
ML20128B630
Person / Time
Site: Palo Verde  
Issue date: 06/13/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-32828-EEVB, DER-85-07, DER-85-7, NUDOCS 8507030305
Download: ML20128B630 (2)


Text

F

.- p e.

.- 13ECEIVED z

o IIRC Arizona Nuclear Power Project

'l985 JUN 19 P.O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 l*. 3 l REGION yim June 13, 1985 ANPP-32828-EEVB/TPS U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of,Raactor Safety and Projects

Subject:

Time Extension for Report - DER 85-07 A 50.55(e) Potentially Reportable Deficiency Relating to The Lack of Bolt Nut Retention Mechanism on CE Instrument Rack Design File: 85-019-026; D.4.33.2

Reference:

A) Telephone conversation between L. Miller and T. Bradish on March 5, 1985 B) ANPP-32329, dated April 8, 1985 (Interim Report)

C) ANPP-32654, dated May 16, 1985 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by June 15, 1985.

While performing the evaluation for this potential deficiency, questions concerning the qualification of the subject holting mater-ial were raised. The ANPP is currently corresponding witb CE over this issue for Units 2 and 3, and it is now expected that a Final Report will be issued by July 12, 1985.

The Unit 1 instrument rack bolting has been examined and determined to be antisfactorily qualified.

Very truly yours,

\\

8507030305 g oh28 W

R PDR ADOCA PDR E. E. Van Brunt, Jr.

O Executive Vice President Project Director EEVB/TPS/jb cc:

See Page Two u

ZE-J1

E' t

Mr. D. F. Kirsch DER 85-07 Page Two cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 D. B. Karner 4060 W. E. Ide 4074 D. B. Fasnacht 6330 A. C. Rogers 4056 L. A. Souza 6195 D. E. Fowler 6254 T. D. Shriver 6085 C. N. Russo 6330 B. S.'Kaplan 4072 J. R. Bynum 6125 J. M.; Allen 6130 D. Canady 6345 A..C. Gehr 4141 W. J. Stubblefield 6330 W. G. Bingham Bechtel/Norwalk R. L. Patterson 6330 R. W. Welcher Bechtel/Norwalk H. D. Foster 6330 D. R. Hawkinson 6330 R. P. Zimmerman 6241 M. L. Clyde 6079 B. T. Parker 6345 T. J. Bloom 4057 D. N. Stover 4082 J. D. Houchen 6254 J. E. Kirby 6249 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339

)