Forwards Insp Repts 50-334/92-25 & 50-412/92-25 on 921026-30.Overall,inspectors Concluded That Plant Design & Procedures Were Adequate to Achieve Safe Shutdown Following Cable Spreading Room Fire
Date released: 05/21/2020 Download: ML20128B596


Insp Repts 50-334/92-25 & 50-412/92-25 on 921026-30.No Violations Noted.Major Areas Inspected:Design & Procedures Used to Mitigate Consequences of Cable Spreading Room Fire
ML20128B627
Person / Time
Site: Beaver Valley
Issue date: 11/24/1992
From: Beall J, Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20128B627 (11)
Forwards Insp Repts 50-334/92-25 & 50-412/92-25 on 921026-30.Overall,inspectors Concluded That Plant Design & Procedures Were Adequate to Achieve Safe Shutdown Following Cable Spreading Room Fire
ML20128B591
Person / Time
Site: Beaver Valley
Issue date: 11/24/1992
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: SIEBER J D
DUQUESNE LIGHT CO.
References
Download: ML20128B591 (3)