Forwards Request for Addl Info Re TMI Action Item I.C.1 Concerning Emergency Operating Procedures,Per Review of Application for OL
ML20128B554
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/10/1985
From: Butler W
Office of Nuclear Reactor Regulation
To: William Cahill
GULF STATES UTILITIES CO.
References
TASK-1.C.1, TASK-TM NUDOCS 8505240574
Download: ML20128B554 (7)


Text

c .

MAY 101985 Docket No. 50-458

' Mr. William J. Cahill, Jr.

' Senior Vice President River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker

Dear. Mr. Cahill:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - EMERGENCY OPERATING PROCEDURES As a-part' of the NRC staff's review of your application for an operating license for' River Bend Station, the staff has determined the need for additional information in the area of TMI Action Plan Item I.C.1. The request for infonnation is included in the enclosure as five comments to GSU letter dated April 17, 1985 (RBG-20638).

Please inform NRC Project Manager, Stephen Stern, of your schedule for response and for clarification or further discussion on this topic.

Sincerely, M mf 491 sTermd br Wa :ter R. Butler, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated cc: See next page Distribution: IDocket! File] NRC PDR Local PDR PRC System NSIC

.LB#2 Reading ~ EHyl t6ii~ SStern JPartlow BGrimes EJordan Dewey,0 ELD ACRS(16) JBongarro f'

LB#2NL7PM LB#2/DL/BC SStern:1b WButler 05/{0/85 05/go/85 8505240574 850510 PDR ADOCK 05000458 F PDR

E le h

z.

MAY 101985 j . Docket No. 50-458 Mr. Nilliam J. Cahill, Jr.

Senior Vice President-

' River Bend Nuclear Group Gulf States Utilities Company

Post Office Box.2951~
Beaumont. Texas 77704
ATTN: Mr. J. E; Booker

Dear Mr. Cahill:

SUBJECT:

-REQUEST FOR ADDITIONAL INFORMATION - EMERGENCY OPERATING PROCEDURES

'As a part of the'NRC staff's review of your application for an operating license for River Bend Station, the staff has determined the need for

, additional information in the area of TMI Action Plan Item I.C.1. The nrequest for infonnation is included in the enclosure as five coments to

~~

-GSU -letter dated ' April 17, 1985 (RBG-20638)..

Please. inform NRC Project Manager, Stephen Stern, of your schedule for response-and for clarification or further discussion on this topic.

Sincerely, Mew sfema ny, _

Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

-As stated

^

'ec: . See next page Distribution: Docket File -NRC PDR  : Local PDR PRC-System NSIC

-LBW2 Reading EHylton SStern JPartlow BGrimes EJordan Dewey,0 ELD ACRS(16) JBongarro 71 LB#2'/ 7PM 'LB#2/DL/BC SStern:lb WButler 05/{0/85 05/go/85 l'

e

, #pa ;8 cog g UNITED STATES f g NUCLEAR REGULATORY COMMISSION

, D ;j WASHINGTON, D. C. 20555

\*****/ MAY 10 1985 Docket No. 50-458 Mr. William J. Cahill, Jr.

Senior Vice President River Bend Nuclear Group Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 ATTN: Mr. J. E. Booker

Dear Mr. Cahill:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - EMERGENCY OPERATING PROCEDURES As a part of the NRC staff's review of your application for an operating license for River Bend Station, the staff has determined the need for additional information in the area of TMI Action Plan Item I.C.1. The request for information is included in the enclosure as five corrents to GSU letter dated April 17, 1985 (RBG-20638).

Please inform NRC Project flanager, Stephen Stern, of your schedule for response and for clarification or further discussion on this topic.

Sincerely, Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated cc: See next page

i:

tir. William J. Cahill, 'Jr. River Bend Nuclear Plant Gulf States Utilities Company cc: Troy B. Conner, Jr. , Esq. Ms. Linda B. Watkins/Mr. Steven Irving Conner and Wetterhahn Attorney at Law 1747 Pennsylvania Avenue, N. W. 355 Napoleon Street Washington, D.C. 20006 Baton Rouge, Louisiana 70802 Mr. . William J. Reed, Jr.

Director - Nuclear Licensing Gulf States Utilities Company Post Office Box 2951 Beaumont, Texas 77704 Mr. David Zaloudek Nuclear Energy Division H. Anne Plettinger Louisiana Department of

'3456 Villa Rose Dr. Environmental Quality Baton Rouge, Louisiana 70806 Post Office Box 14690 Baton Rouge, Louisiana 70898 Richard it. Troy, Jr. , Esq.

Assistant Attorney General in Charge State of Louisiana Department of Justice 234 Loyola Avenue New Orleans, Louisiana, 70112 Mr. J. David McNeill, III Dwight D. Chamberlain William G. Davis, Esq.

Resident Inspector Department of Justice Post Office Box 1051 Attorney General's Office

- St. Francisville, Louisiana 70775 7434 Perkins Road Baton Rouge, Louisiana 70808 Gretchen R. Rothschild Louisianians for Safe Energy, Inc.

1659 Glenmore Avenue Baton Rouge, Louisiana 70775 James W. Pierce, Jr. , Esq.

P. O. Box 23571 Baton Rouge, Louisiana 70893 Mr. Robert D. Martin U.S. NRC, Region IV Parkway Central Plaza Building 611 Ryan Plaza Drive, Sutie 1000 Arlington, Texas 76011

F io 1 Enclosure '

1 EVALUATION OF THE RIVER BEND STATION RESPONSE l TO A REQUEST FOR ADDITIONAL INFORMATION CONCERNING PLANT-SPECIFIC DEVIATIONS FROM GENERIC TECHNICAL GUIDELINES Following is the Procedure and Systems Review Branch evaluation of the River Bend Station April 17, 1985, response to a Request l for Additional Information concerning plant-specific deviations '

from generic technical guidelines (dated March 18, 1985):

COMMENTS ON ATTACHMENT 1 DEVIATION, PAGE NO. 7 and 16:

1. From the staf f's review of step C3.3.6, EOP-0001, Rev.1, the step appears to incorporate portions of contingencies 2 and 7 of the EPGs (Rev.3). Placing both of these contingencies within the same step makes the technical compatability of the contingencies questionable because the sections referenced of each contingincy have different purposes. The procedural addition, as identified in the applicant's justification to this deviation, does not satisfy the intent of EPG step C2-1.3. Provide justification for the approach being taken by the revised EOP step C3.3.6.3 or describe how the guidance for EPG step C2-1.3 will be incorporated into the revised EOP step.
2. The addition to step C3.3 6.3 is improperly constructed.

"IF...BUT", is not an acceptsble togic statement and does not conform to the guidance provided in the applicant's Author's Guide. lNio acceptable rewor i ss for this construction are, "IF more than 2 SRV's are open d)less than 7 are open, THEN continue in this procedure at Step. 3.3.6.4" and, "IF between 2 and 7 SRV's (inclusively) are open, THEN continue in this procedure at Step 3.3.6.4". Provide a correctly reworded step C3.3.6.3.

3. The response to this item refers to Rev. 2 of EOP 0001. If the change to this deviation (page no. 7) has resulted in additional safety-significant deviations, provide these deviations with their justifications or a statement that no safety-significant deviations were created by Rev. 2.

___ m .

9,. . MAR DEVIATION PAGE NO.10:

Indicate whether or not the GE review of the EOPs and AOP-0020, 0021,'and 0022, resulted in any questions / changes to the procedures..If there were questions and/or changes from the review, indicate if they have resulted in additional ,

safety-significant deviations. Provide the additional deviations with their justifications if any have occurred.

DEVIATION PAGE NO.17:

Response provided is satisfactory.

DEVIATION PAGE NO.19:

Response is satisfactory.

DEVIATION PAGE NO.20:

Response is satisfactory.

DEVIATION PAGE NO.27:

Response is satisfactory.

DEVIATION PAGE NO.35:

Response is satisfactory.

DEVIATION PAGE NO.52:

Response is satisfactory, provided that step C3.1.4 is the same step as C3.1.3 in EOP-0005, Rev.l. If step C3.1.4 is different than C3.1.3 (Rev.1), explain why the step was renumbered.

0: .

ggy,

=

COMMENTS ON ATTACHMENT 2-DEVIATION PAGE NO.39

- Provide an explanation for this deviation. It was an item

- included in the March 18, 1985 RAI.

DEVIATION PAGE NO.18:

- Response is satisfactory.

DEVIATION PAGE NO.34:

Response is satisfactory.

DEVIATION PAGE NO.50: .

Response is satisfactory.

I e