Suppls 930125 & 28 Ltrs Clarifying Qualification of 36-inch Cable Tray Thermo-Lag 330-1 Fire Barrier.Util Will Perform Confirmatory Test for 36-inch Wide Fire Barrier Sys Utilizing Acceptance Criteria in Util
ML20128B009
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 02/01/1993
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-93076, NUDOCS 9302020370
Download: ML20128B009 (2)


Text

._ - ____ ___.

s

==

l:::l: 7 =

i i

h Log

  1. TXX-93076

=

File # 10010 TUELECTRIC fh59,4g p,7, y

February 1, 1993 wulism J. Cahill. Jr.

ormn a rm,sa.o U. S. Nuclear Regulatory Commission Attn:

Document Control Desk d

Washington, DC 20555 i

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) - UNIT 2 DOCKET NO. 50-446 36 INCH WIDE CABLE TRAY REF:

1) TU Electric letter logged TXX-93060 from-Mr. William J. Cahill, Jr. to the USNRC i

dated January 25, 1993

2) -TV Eiectric letter logged TXX-93061 from William J. Cahill, Jr. to the USNRC-i dated January 28, '993 E
3) USNRC letter from Suzanne C. Black to William J.-Cahill, Jr. dated October. 29, 1992
4) TO Electric 1etter logged TXX-92331 from

~

William J. Cahill, Jr. to USNRC dated July 9, 1992 Gentlemen:

TV Electric provided clarifications regarding the qualification of 36 inch cable tray Thermo-Lag 330-1 fire barrier via reference 1 and reference 2.

Thistestwasconductedasscheme1-2-(scheme 1).

Justification for the acceptability of this test was documented in reference 1 attachment-4.

In order to resolve NRC concerns, TV Electric will take one of the following actions

  • a)

Perform a confirmatory test-for a 36 inch wide cable tray Thermor Lag 330-1 fire barrier system utilizing the acceptance criteria provided-in reference 3; b)

Participate in'the testing program (s)' initiated by the industry to resolve the concerns regarding cable tray fire barrier systems;

. ; n n n ('

Q h0 O

6 g.

g8 g

w. oo.. < m., o.u 1..., >m

i r,

i TXX-93076 Page 2 of 2 i

c)

Provide additional clarification /,iustification with respect to the i

acceptability of the scheme 1 (i.e.

36 inch wide cable tray)..

These actions will be completed by the end of the first refueling outage for Unit 2.

i The 36 inch wide cable trays of concern ure located in the Auxiliary Building, which is a common building for Unit 1 and Unit 2.

As stated in r

response to NRC Bulletin 92-01 (reference 4), compensatory measures have been established, and will remain in place until in each plant area with Thermo-Lag until the qualification of the Thermo-Lag in that area is established.

Sincerely,

.M William J. Cahill Jr.

i OB/tg c-Mr. J. L. Milhoan Region IV Mr. B. E. Holian NRR Mr..f. A. Bergman NRR Resident Inspectors. CPSES (2) l 1

(