ML20128B000
| ML20128B000 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/18/1985 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20128B002 | List: |
| References | |
| NUDOCS 8507030090 | |
| Download: ML20128B000 (1) | |
See also: IR 05000266/1985008
Text
_
'
.
JUN 181985
.
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. C. W. Fay
Vice President
Nuclear Power Department
231 West Micnigan, Room 308
Milwaukee, WI 53201
Gentlemen:
This refers 'o the routine safety inspection conducted by Mr. D. E. Jones of
t
this office on April 29-30 and June 6, 1985, of activities at Point Beach
Nuclear Plant, Units 1 and 2, authorized by NRC Operating License No. OPR-24
and No. DPR-27 and to the discussion of our findings with Mr. J. Zach at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a ccpy of
this letter and the enclosure (s) will be placed in the NRC Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
~
~ ~
l0?iginallSignedbyTJ.J.llarrisen
.
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Reports
No. 50-266/85008(DRS)
No. 50-301/85008(DRS)
cc w/ enclosure:
J. J. Zach, Plant Manager
DM8/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
8507030090 850618
Ness Flores, Chairperson
ADOCK 05000266
G
Wisconsin Public Service
Commission
0
km
. r
n
RI&7
RIII
RIII
R II
x
Harrison
{(
ones7cs
(p 7 f ( g a Kiw
DaMelson
ge/W
y l6
\\
06/17/85
,
WE 0/