ML20128A424

From kanterella
Jump to navigation Jump to search
Ro:On 850525,while Performing Containment Integrity Verification Procedure,Two Vent Valves Found Open Though Both Containment Isolation Valves Closed.Next Rept Will Be Delayed Until 850708 Due to Work Load Requirements
ML20128A424
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/24/1985
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8507020672
Download: ML20128A424 (1)


Text

. _.

DUKE POWER GOMPANY P.O. DOX 33180 CHAltLOTTE. N.C. 28242 HALH. TUCKER

,, 7 ; g,

June 24, 1985

"-=*=<==

Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

McGuire Nuclear Station, Unit 1 Docket No. 50-369 Gentlemen:

On May 25, 1985 while performing the Containment Integrity Verification Procedure, two containment vent valves were found open, though both containment isolation valves were closed.

This has been determined to be reportable under 10 CFR 50.73(a)(2)(1)(B) with a report due June 24, 1985. Due to work load requirements, this report will be delayed until July 8, 1985.

If you have any questions please contact Jerry Day at (704)373-7033.

Very truly yours, kb lM l/ Hal B. Tucker JBD: sib cc: Dr. J. Nelson Grace, Regional Administrator Mr. W. T. Orders U. S. Nuclear Regulatory Commission NRC Resident Inspector McGuire Nuclear Station Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 INFO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 M&M Nuclear Consultants 1221 Avenue of the Americas New York, New York 10020 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange, Suite 245 270 Farmington Avenue Farmington, CT 06032 yp 0 t 8507020672 850624 PDR ADOCK 05000369 S PDR}}