ML20128A055
| ML20128A055 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 05/17/1985 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Randazza J Maine Yankee |
| Shared Package | |
| ML20128A059 | List: |
| References | |
| NUDOCS 8505240112 | |
| Download: ML20128A055 (2) | |
See also: IR 05000302/2004013
Text
6h;, g?,5;!g
-
,
it Q
Si
s
'
7
.
.r
-
MAY'171985
-
' # ~
iDOCKET/ LICENSE: .50-309/DPR-36.
l Maine-Yankee: Atomic' Power Co.
ATTN:1 Mr. J. B. - Randazza:
-
'
Vice President
Nuclear Operations-
83 Edison Drive
'
1 Augusta, Maine 04366:
>
' Gentlemen:
~
-Subject: ;NRC:RI; Inspection 50-309/85-06
. -
"
1This transmits the March.2
' April' 13,1985. resident inspection' firidings by Mr.
2 C..-Holden.at the Maine Yankee Atomic Power, Wiscasset, Maine. Those findings were
.
based on observation of activities, interviews, independent measurements, and.
document reviews, and have been . discussed with Mr; Garrity' of your staff.
'
Wiihinithescopeof[this[ inspection,noviolationswereobserved.
.
Your persistant efforts to control chloride levels'in the steam generators have
E,
resulted in an elimination of condenser leaks and chloride's in~the generators.
Even though this situation may reoccur'due'to the condition of the main condenser,
- we are pleased with your results.
Your cooperation with us is appreciated.
Sincerely,.
Original Signed BYt
_
Edward C.' Wenzinger, Chief
Projects Branch No. 3
<
. Division of Resident Programs
'
Enclosure:;NRC Region I Inspection Report 50-309/85-06:
'cc'w/ enc 1:
..
- C.E._Monty, President
C.D. Frizzle, Assistant Vice! President / Manager of Operations
.
J.H. Garrity, Plant Manager
P.L._ Anderson,-Project Manager
2;
J.A.'Ritsher, Attorney (Ropes and Gray)
-Public Document Room (PDR)
'
= Local.Public Document Room (LPDR)
- Nuclear. Safety Information Center (NSIC)
NRC Resident Inspector
< State of Maine (2)
$
g~D } .
9
.
Y
n;
-
.
lll
-~
.;
,
.
- .
.%
..;1. :
_
4
Msine Yankee'Aiomic Power' Company
2
g4y
bcc w/ encl:
Region I. Docket' Room (with concurrences)-
1 Senior Operations Officer (w/o enclosures)
DRP Section Chief
.
.
.
'I
RI-
RI: RP
h
Ho
n/geb
Elsi
ser
W
zi
r
4/5785
4' qQ
g lg
0FFICIAL RECORD COPY
DL50-309/85-06 - 0002.0.0
04/26/85
)
F