ML20127P828

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-528/92-41,50-529/92-41 & 50-530/92-41 on 921103-1214.No Violations Noted
ML20127P828
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/13/1993
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20127P830 List:
References
NUDOCS 9302020084
Download: ML20127P828 (3)


See also: IR 05000528/1992041

Text

, . _- - . _

,

'

% UNITED STATES

. e[i3 k NUCLEAR REGULATORY COMMISSION

FSEGION V  :

.I%,f4

h. . 7

i

1450 manta LNJE

'%, ,

+f WALLT CnEEK, CAUFOnNIA 04Wes368

JAN 131093

Docket Hos. 50-528, S0-529, and 50-530

License kos. NPT-41, NPF-51, and NPT-74

Arizona Public Servir.e Company

P.O. Box 51999, Station 9012

Phoenix, Arizoaa 85072-3999

Attention: Mr. W. f. Conway

Executive Vice President, Nuclear

Genticuien:

SUBJECT: HRC INSPECTION REPORT NO. 50-528/529/530/92-41

Thi:, refers to the inspection conducted by J. Sloan,11. Freeman, D. Kirsch, F.

Ringwald, and T. Sundsmo of this office, on November 3 through December 14,

1992. The inspection included a review of activities authorized for your Palo

Verde facility. At the conclusion of the inspection, the findings were

discussed with thnse members of your staff identifit,d in the enclosed t eport.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective exaninations of procedures

and representative records, interviews with personnel, and observation af- .

activities in progress.

Your attention is directed to paragraph 7 of the enclosed report which

discusses a reactor trip at Unit-1 caused by the failure-of a protective relay

associated with the main generator. This event is of concern in that vendor

iMormation was previously available indicating that the relay which failed

should have been modified to correct known problems. Additionally, it

appeared that the relay vendor was contacted.only after NRC questioning

prompted the action. You are encouraged to ensure that vendo,' information is

-- ,

adequately controlled and assessed.

Two non-cited violations were identified during this- inspection. The first

dealt with a technician performing an independent verification of a valys '

position in a tanner that did not meet your expectations. The second ins *,ance

involved the rem 9 val of a circuit breaker from its cuo'cle without a

-

maintenance ~ order ta control the work. Both violations were not cited because

of your corrective actions and the relatively low safety significance of the

occurrences.

!

/

g

9302020004 930113 ,h,

'y

DR ADOCK 0500 GK

_

._ . . - . . . .- .- . .-

p

.

JAN 13 !W

'

^

. .2 .

In accordance with 10 CfR Part 1.790 of the 14RC's " Rules of Practice,' a copy

of this letter ar.d the enclosure will be placed -in the NRC Public Documer,t

-

i

Room,

,

Should you have-any questions concerning this inspection, we will be glad *,o

discuss them wi+.h you.

Sincerely,

Sr* N

5. A. Richaros, Deputy Director i

Division of Reactor Safety and Projects:

Enclosure:

Inspection Report Numbers 50-528/92-41, 50-529/92-41, and 50-530/92-41

cc w/er.lasures:

Mr. O. Mark DeMichele, APS ,

Mr. James M. Levice, APS

Mr. R. Stevens, APS

Mr. S. Guthrie, APS

Mr. E. C. Simpson, APS

Mr. Robert W. Page, APS

Mr. Thomas R. Bradish, APS

Ms. Nancy C. Loftin, Esq., Corporate Secretary & Corporate Counsel, APS

Mr. Curtis t.-Hoskins, El Paso Electric Company

Mr. Steve Olea, Chief Er.gineer, Arizona Corporation Commission

Mr. Aubrey Godwin, Directer, Arizona Radiation Regulatory Agency (ARRA)

Chairman,_Maricopa County' Board nf Supervisors

Mr. Bradley W. Jones, Esq. , Akint Gump,. Strauss. Hauer and Feld

Mr. Jack R. Newman, Esq., Newman & Holtzinger P. C.

Mr. Roy P..lessey, Jr., Esq., Arkin,'Gump, Strauss, Hauer and Feld

Mr. . lames A. Beoletto, Esq., Assistant l.ouncil, Southern-California Edison

'

Company

Mr. Ch:,rles B. Brinkman, combustion Engineering, . Inc.

.

4 *

!

.m., . . _ , - . . , - _ 4 ,4 ~ ,-,

_ __ -

- _

7

. .

'

.

'

-3- JAN 191993

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy

of this letter and the enclosure will be placed in the NRC Public Doccment

Room.

Should you have any questions concerning this inspection, we will be glad to "

discuss them with you.

Sincerely,

.

/St -

S. A. Richards, Deputy Director

Division cf Reactor Safety and Projects

Enclosure:

Inspectton Report Numbers 50-528/92 41, 50-529/92-41, and 50-530/92-41

bec w/ enclosures: bec w/o enclosure B:

Docket file LfMD

G. Cook M. Smith

B. faulkenberry

J. Martin

Resident _intpector (4)

Proiect insoector

4p. gp4' cf%( l t

JSloanf Hfreeman TSunds ,o

FRingwad '

.L/D/93 .UO93 _LU0/93 43.&/9

.

@t5FCOW1 RtWEST "9~I REQUE3TTOTI 145TTOPTI

ff S ) / NO ] YLS__ -Q _1 YES / Ulu '"

1 FS// NO _1

,/ /

  1. Re}ynkr SRichps

ards DKir Ih

_/ 193 HW

'

/, . 93

.

I/(3/93 / // /93

f

RE L$T~CDPr]J'EWESTCONl(Tit

YE A, NO

f

YNEST/ ND 1 'ES'I/

- ilQ ] LYLS ~//1L0

L. 011t$TCDPT ,

"

Jdtf7T ~7DTf]

(YES / /

(V _ fiq __1 .

010141

Tcoi ,

. _ _ - . __ ,