ML20127P828
| ML20127P828 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/13/1993 |
| From: | Richards S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML20127P830 | List: |
| References | |
| NUDOCS 9302020084 | |
| Download: ML20127P828 (3) | |
See also: IR 05000528/1992041
Text
,
.
_- -
.
_
,
e[i
k
NUCLEAR REGULATORY COMMISSION
%
UNITED STATES
'
.I h. .
.
3
i
FSEGION V
7
1450 manta LNJE
%,f4
+f
WALLT CnEEK, CAUFOnNIA 04Wes368
'%,
,
JAN 131093
Docket Hos. 50-528, S0-529, and 50-530
License kos. NPT-41, NPF-51, and NPT-74
Arizona Public Servir.e Company
P.O. Box 51999, Station 9012
Phoenix, Arizoaa 85072-3999
Attention:
Mr. W. f. Conway
Executive Vice President, Nuclear
Genticuien:
SUBJECT: HRC INSPECTION REPORT NO. 50-528/529/530/92-41
Thi:, refers to the inspection conducted by J. Sloan,11. Freeman, D. Kirsch, F.
Ringwald, and T. Sundsmo of this office, on November 3 through December 14,
1992.
The inspection included a review of activities authorized for your Palo
Verde facility.
At the conclusion of the inspection, the findings were
discussed with thnse members of your staff identifit,d in the enclosed t eport.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective exaninations of procedures
and representative records, interviews with personnel, and observation af-
.
activities in progress.
Your attention is directed to paragraph 7 of the enclosed report which
discusses a reactor trip at Unit-1 caused by the failure-of a protective relay
associated with the main generator.
This event is of concern in that vendor
iMormation was previously available indicating that the relay which failed
should have been modified to correct known problems. Additionally, it
appeared that the relay vendor was contacted.only after NRC questioning
prompted the action.
You are encouraged to ensure that vendo,' information is
--
,
adequately controlled and assessed.
Two non-cited violations were identified during this- inspection. The first
dealt with a technician performing an independent verification of a valys
'
position in a tanner that did not meet your expectations.
The second ins *,ance
involved the rem 9 val of a circuit breaker from its cuo'cle without a
maintenance ~ order ta control the work.
Both violations were not cited because
-
of your corrective actions and the relatively low safety significance of the
occurrences.
!
/
g
9302020004 930113
,h, 'y
DR
ADOCK 0500
GK
_
._ .
.
-
.
.
.
.- .-
.
.-
p
.
JAN 13 !W
'
^
.2 .
.
In accordance with 10 CfR Part 1.790 of the 14RC's " Rules of Practice,' a copy
of this letter ar.d the enclosure will be placed -in the NRC Public Documer,t
-
i
Room,
,
Should you have-any questions concerning this inspection, we will be glad *,o
discuss them wi+.h you.
Sincerely,
Sr* N
i
5. A. Richaros, Deputy Director
Division of Reactor Safety and Projects:
Enclosure:
Inspection Report Numbers 50-528/92-41, 50-529/92-41, and 50-530/92-41
cc w/er.lasures:
Mr. O. Mark DeMichele, APS
,
Mr. James M. Levice, APS
Mr. R. Stevens, APS
Mr. S. Guthrie, APS
Mr. E. C. Simpson, APS
Mr. Robert W. Page, APS
Mr. Thomas R. Bradish, APS
Ms. Nancy C. Loftin, Esq., Corporate Secretary & Corporate Counsel, APS
Mr. Curtis t.-Hoskins, El Paso Electric Company
Mr. Steve Olea, Chief Er.gineer, Arizona Corporation Commission
Mr. Aubrey Godwin, Directer, Arizona Radiation Regulatory Agency (ARRA)
Chairman,_Maricopa County' Board nf Supervisors
Mr. Bradley W. Jones, Esq. , Akint Gump,. Strauss. Hauer and Feld
Mr. Jack R. Newman, Esq., Newman & Holtzinger P. C.
Mr. Roy P..lessey, Jr., Esq., Arkin,'Gump, Strauss, Hauer and Feld
Mr. . lames A. Beoletto, Esq., Assistant l.ouncil, Southern-California Edison
Company
'
Mr. Ch:,rles B. Brinkman, combustion Engineering, . Inc.
.
4
!
.m.,
. . _ ,
-
. . , - _
4
,4
~ ,-,
7
_
__
-
-
_
.
.
'
.
'
-3-
JAN 191993
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and the enclosure will be placed in the NRC Public Doccment
Room.
Should you have any questions concerning this inspection, we will be glad to
"
discuss them with you.
Sincerely,
.
/St
-
S. A. Richards, Deputy Director
Division cf Reactor Safety and Projects
Enclosure:
Inspectton Report Numbers 50-528/92 41, 50-529/92-41, and 50-530/92-41
bec w/ enclosures:
bec w/o enclosure B:
Docket file
LfMD
G. Cook
M. Smith
B. faulkenberry
J. Martin
Resident _intpector (4)
Proiect insoector
4p.
gp4'
cf%(
l
t
JSloanf
FRingwad
Hfreeman
TSunds ,o
.L/D/93
.UO93
_LU0/93
43.&/9
'
@t5FCOW1 RtWEST "9~I REQUE3TTOTI
145TTOPTI
.
ff S ) / NO
] YLS__
-Q _1 YES / Ulu
1 FS// NO _1
'"
/
,/
SRichps
ards
DKir Ih
- Re}ynkr
HW . 93
I/(3/93
/ // /93
_/
193
' /,
.
RE L$T~CDPr]J'EWESTCONl(Tit 011t$TCDPT
f
YE
A,
NO
YNEST/ ND
1 'ES'I/ ilQ
] LYLS ~//1L0
f
L.
-
,
Jdtf7T ~7DTf]
"
(V _ fiq __1
(YES / /
.
010141
Tcoi
,
.
-
.
__
,