Application to Amend Licenses DPR-39 & DPR-48,revising Radiological Effluent Tech Specs & Administrative Controls. Amend Involves Nshc.Fee Paid
ML20127P764
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/25/1985
From: Leblond P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20127P767 List:
References
0275K, 275K, NUDOCS 8507020511
Download: ML20127P764 (2)


Text

.

Commonwealth Edison On > First N1tional Plaza. Chictgo. Illinois Address Reply to: Post Office Box 767 Chicago, Illinois 60690 June 25, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Zion Nuclear Power Station Units 1 and 2 Proposed Amendment to Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Reference:

October 2, 1984 letter from R. N. Cascarano to H. R. Denton.

Dear Mr. Denton:

to this letter is a proposed amendment to Facility Operating License Nos. DPR-39 and DPR-48, Appendix A, Sections 3/4.11, 3/4.12, 3/4.14, 3/4.16 3/4.20 and Sections 6.1 through 6.8.

These changes address the areas of Radiological Effluent Technical Specifications (RETS) and Administrative Controls. These changes have been prepared based upon j

the Zion Technical Specifications following Amendment Nos. 89 to DPR-39 and 79 to DPR-48. to this letter is a demonstration that the proposed amendment involves no significant hazards consideration. The proposed amendment has received On-Site and Off-Site review and approval.

A draft copy of these changes, along with proposed changes to Section 1.0 (Definitions), was submitted for your review by the referenced letter. The proposed changes to Section 1.0 have not been completely reviewed at this time and will be submitted at a later date.

The proposed amendments will involve a significant number of changes in the operation of Zion Station. Thus, it is requested that Commonwealth Edison Company be notified in advance of the issuance of this amendment so that the implementation can begin.

It should be noted that some plant modifications can require a year or more to install depending upon equipment availability and outage schedules.

In addition, the number of procedure changes will be large and could require six months to implement.

{

PDR ADOCK 05000295 h

(d (b B507020511 850625 0

hp g(

P PDR g 00

H..

H. R. Denton June 25, 1985 A $150.00 fee remittance is enclosed in accordance with 10 CFR 170. As provided by 10 CFR 50.91, the State of Illinois is being notified of this amendment request by transmittal of a copy of this letter and the attachments.

If you have any further questions regarding this matter, please contact this office.

Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are hereby provided for your review.

Very truly yours, h

b P. C. LeBlond Nuclear Licensing Administrator 1m Attachment cc: NRC Resident Inspector - Zion J. Norris - NRC G. Wright - State of Ill.

SUBSCRIBED AND SWORN to c

befory]me this eWr-day of ' Uka p

, 1985 i.

N f)Yate NotaryPublic(j 1

l 0275K l