ML20127P744

From kanterella
Jump to navigation Jump to search
Requests Analysis of Engineering Factors Included in Design Re Structural Response of Facility & Ground Motion & Other Related Structural Requirements
ML20127P744
Person / Time
Site: Monticello 
Issue date: 11/20/1968
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Newmark N
ILLINOIS, UNIV. OF, URBANA, IL
References
CON-AT(49-5)2667 NUDOCS 9212030093
Download: ML20127P744 (2)


Text

..

a

..:. i g

Nov 2 o m SUPPLEMENTAL FILE COPY m

Docket No. 50-263

% 1; N;

.)

Dr. Nathan H. Newmark 1114 Civil Engineering Building

  1. \\% -

University of Illinois Urbana, Illinois 61801 EM

Dear Dr. Newmark:

Re: Contract No. AT(49-5)2667 Nathan H. Newmark Consulting Engineering Services is hereby requested,-

pursuant to the conditions of Contract AT(49-5)2667, to provida the following services for the Comission concerning the operating license safety review for the Northern States Power Company, Monticello Nuclear Generating Plar. Unit 1:

1.

Analyses of the engineering factors included in the design pertaining to the structural response of the facility to ground motion and other related structurni requirements.

2.- Serving as an expert witness in the public hearing on this facility, if required.

?

Reporting Requirements: Preparation of a report on (1) above pursuant to Article I, parsgraph-(a) of'the contract.

All costs shall be itemized and requests.for reimbursement shall' be submitted pursuant to Article III of the sontract._ Any potential $

conflicts'of interest shall be W F reported pursuant to Artiela I,1 a

paragraph - (d) of the contract.+-7

~

Honatary ceiling: $6,000.

- /

1-9212030093 681120 PDR ADOCK 05000263 A

PDR y

,1,

J Dr. 1;athan M. Newmark Period of Perforn.ance:

NOV 2 0 W through Juna 30, 1969.

Other applicable requirements; None.

This constitutes a Work Directive pursuant to Article I, paragraph (b) of Contract No. AT(49-5)2667.

A copy of Volumes I, II, III, and IV of the Final Safety Analysis Report is enclosed for your review.

Amendeent No. 10, dated November 8, 1968, to the Montisello Final Safety Analysis Report is also enclosed for your information. The amendment consists of Appendicea B and D, and thermal and hydraulic data previously excluded from the Final Safety Analysis Report.

Sincerely, ted.,es) 31 ped by pt A. u.a.:

Peter A. Morris, Director Division of Reactor Licensing (Authorized Representative for the Contracting Officer)

Enclosures:

As stated above bec:

S. A. Teets, DR Joseph L. Smith, DC Ray Conoway, OC Distribution:

Suppl.

DR Reading RL Reading RPB-1 Reading P. A. Morris R. S. Boyd D. R. Muller OGC R. C. DeYoung N. Blunt

]. WRL.:RPB-1 ornu >

_RL:RPE

.D"

........D

.. O,+.,a RL s

/3 g~

-C '[ l '

,, y

/

.B1hntj(g.... Nassallo/EILler...Boyd/Dut....D(!Ycung..,h.f....

h {c suasam >

,_ m._%11/13/68 = E// /43=,..

,11,( /68..

11/Lk/pa.. i.lif..LI63.. _11L.../.61.

_o*

M

_