Text
(
Docket No. 50-368 Mr. John M. Griffin Senior Vice President Energy Supply Arkansas Power & Light Company P. O. Box 551 Little Rock, Arkansas 72203
Dear Mr. Griffin:
SUBJECT:
INSERVICE TESTING (IST) PROGRAM FOR ARKANSAS NUCLEAR ONE, UNIT 2 (ANO-2)
By letter dated June 15, 1978, as supplemented by letters dated October 29, 1980 and December 10, 1982, you submitted an IST program for AN0-2 and requested relief frcm certain requirements of Section XI of the ASME Code pursuant to 10CFR50.55a(g)..
On September 21, 1979, we issued an interim relief based on our preliminary review of your June 15, 1978 submittal pending our detailed review. We have now. completed our detailed review of your submittal and our findings with respect to the requests for relief are provided in the enclosed Safety Evaluation (SE). Based on the results of this review, we have determined that all'the relief requests except one request pertaining to stroke timing of the emergency feedwater pump turbine governor. valve should be granted.
Additionally, we have determined that the scope of the AN0-2 IST program should be expanded to include certain safety related pumps and valves in the diesel generator auxiliary systems.
It is requested that your response addressing this subject be submitted within 60 days of the date of this letter.
In accordance with 10 CFR 50.55a(g), the relief granted, as delineated in the enclosed SE, supersedes the interim relief and expires on March 25, 1990, i
which is 10 years following the date of commercial operation of ANO-2.
If, during your continued implementation of the program or after completing the requested evaluation for expanding scope of the program, you determine that additional relief is needed, you should submit a supplemental request for relief and provide justification for your request.
%[OpD PDR P
m I
~-
I
\\ i ed that the code For the reliefs that have been granted, we have determ n lief requests are authorized by ommon defense and security requirements are impractical and that the re h due consideration to the law and will not endanger life or property or t e c quirements were imposed and are otherwise in the public interest, givingburden up on the facility.
Sincerely,
. Original signed by Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page Distribution:
Docket File NRC & L PDRs Branch Files HThompson OELD ACRS 10 Edordan JPartlow BGrimes PKreutzer RLee ly)
- See previous white for concurrences (BC name change on OELD*
AD/0R/DL
- ORB #3:DL*
GClainas ORB #3:DL*
JRMiller 6 / 6/85 f/18 /85 McGurren ORB #3:DL*
RLeetef 4 /23/85 PKreutzer 4/22 /85 4/ 2785
~ ~ ____
C 2_
For the reliefs that have been granted, we have determined that the code requirements are impractical and that the relief requests are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
Sincerely, i
James R. Miller, Chief Operating Reactors Branch No. 3 Division of Licensing
Enclosure:
As stated cc w/ enclosure:
See next page
-Distribution:
Docket File NRC & L PDRs Branch Files HThompson OELD ACRS 10 EJordan JPartlow BGrimes PKreutzer RLee Ulf ORB # :DL ORB #3:DL
.DL OELD /
AD/ /DL PJefeilt;zer RLee;ef RMil'ler 1 P' G ainas f'If/85
( /2 185
, I) /85 k
185 9y185 g
f,
U f 3,f t,'j s
L:,
g,, j+ A > f *
,:vn/
aS v
s Mr. John M. Griffin Arkansas Power & Light Company Arkansas Nuclear One, Unit No. 2 Mr. J. Ted Enos, Manager, Licensing Arkansas Power & Light Company P. O. Box 551 Little Rock, Arkansas 72203 Mr. James M. Levine, General Manager Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Nicholas S. Reynolds Bishop, Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, N.W.
Suite 700 Washington, DC 20036 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations C-E Power Systems e
7910 Woodmont Avenue Bethesda, Maryland 26814 Regional Administrator (2)
USNRC, Region IV Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. William D. Johnson U.S. NRC P. O. Box 2090 Russellville, Arkansas 72801 Mr. Frank Wilson, Director Division of Environmental Health Protection Arkansas Department of Health 4815 West Markam Street Little Rock, Arkansas 72201 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Div.
Suite 220 7910 Woodmont Avenue Bethesda, MD 20814
)