ML20127P590
| ML20127P590 | |
| Person / Time | |
|---|---|
| Site: | Oconee, Mcguire, Catawba, McGuire |
| Issue date: | 01/21/1993 |
| From: | Tucker H DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9302020003 | |
| Download: ML20127P590 (2) | |
Text
A
'1s.
f
- Duke her Company
.lIn B n a r C PO Bos 1006
' Senior lice President
. Charlotte, NC282011006 -
- Nuclear benemtion
' (70M24511 DUKEPOWER January 21, 1993 U. S.--Nuclear Regulatory Commission Attention: Document Control Desk-Washington, D.
C.
20555
Subject:
Utilization of TACO 2 Fuel Performance Computer Codelfor Burnups up to 53,000 MWD /MTU The NRC ext ~ ssed concern (
Reference:
Letter, R.LC. Jones (NRC)?to R. E. - Sund (BdFC), Request for Additional Information on' BAW-10179,1
" Safety Criteria and Methodology for Acceptable Cycle L Reload
- Analyses") -regarding the use of TACO 2 for the-calculation of fuel rod-: internal-pressures at burnups exceeding 50,000 MWD /MTU.cThis-concern was discussed in an' October 15,.1992 telephonescall among; members of - the NRC.1. staff, B&W Fuel Company; and=an'NRC. contract-reviewer. This telecon was documented in a November 9, 1992-letteri from - J. -H. ~ Taylor - (BWFC) to-R.
C.' Jones (NRC). -- It.- was agreed to during ' the call that the current and expected--usage of - TACO 2r for
-fuel rod internal pressure analyses-is. reasonable and that.it is-not-necessary to restrict-usage of-the code to burnup levels'less than 50,000.
Accordingly, Duke Power Company wishesLto advise the~NRC staff of Duke's--intent-to utilize TACO 2_for;the qualification of fuelt(at each of Duke's nuclear stations)) up to a burnup of 53,000: MWD /MTU,-
~
until such time as_ Duke -implements the : TACO 3 Fuel Performance: code.-
-Duke will-reference this letterLand---the: November 29, 1993? letter-s cited above a.s the= basis for applications of. TACO 2 for burnups up-to'53,000 MWD /MTU.
If you have-any questions, please-call 1 Scott Gewehr'at (704)1382-
'7582
[erytrulyyours, AQ>
p ~
Hal-B., Tucker-h I
290073 u
~
9302020003 930121 PDR TOPRP EUTDPC~
l t
C_
PDR' y
.ij x-, ---
~
U.'I!i. Nuclear Regulatory Commission
~
January-21, 1993 Page_2 cc: RMr. T. A. Reed,cProject Manager Office of Nuclear Reactor Regulation U. S.. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D.
C.
20555 Mr. L. A. Wiens, Project Manager Office of Nuclear Reactor Regulation U.
S.
Nuclear Regulat Commission Mail Stop 14H25, OPr.
Washington, D. C 5
Mr.
R.
E. Martin, Froject Manager Office of Nuclear Reactor Regulation U.
S.
Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D.
C.
20555 Mr.
S.
D.
Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 Mr.
P. K. Van Doorn Senior Resident Inspector McGuire Nuclear Station Mr. W. T.
Orders Senior Resident Inspector Catawba Nuclear Station Mr.
P.
E.
Harmon Senior Resident Inspector Oconee Nuclear Station R.
C.
Jones, Chiaf Reactor Systems Branch U.
S.
Nuclear Regulatory Commission Mail Stop 8E21 OWFN Washington, D.
C.
20555