t Georgia Power Ccmpany
- 333 Piedmont Avenue Atlanta, Georgia 30308 Te8ephone 404 5264526 Ma
- hng Address:
Post Ort ce Box 4545 A!!anta, Georgia 30302 Georgia Power L T. Gucwa the southern elecinc system Manager Nuclear Engineenng NFI)-85-381 and Chief Nuclear Engmeer g
May 3, 1985 Director of Nuclear Reactor Regulation Attention:
.Mr. John F. Stolz, Chief.
Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Cocaission thshington, D. C.
20555-NFC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDNIN I. HA'ICH NUCLEAR PLANP UNITS 1, 2 CLARIFICATION OF RESPONSE TO ALLEGATION CCNCERNING NCE-USE OF AU1HORIZED NLCLEAR INSPECIDR Gentlemen:
By letter dated April 16, 1985, Georgia Power Cmpany (GPC) provided its response to an. allegation. that GPC is not using an authorized nuclear inspector (ANI) for all weld repair activities.
The allegaticri was suhttitted to GPC by your letter dated January 28, 1985.
'Ihe purpose of this letter is to clarify a statement contained in the fifth sentence of the 'second paragraph of our April 16, 1985 letter.
That sentence should be replaced in the reading by:
"GPC Ouality Centrol provides essentially the same function as the ANI by performing inspections of repairs, review of procedures,
-etc.
Further, GPC Ouality Assurance atrlits repairs on a selected -
. basis."
Should you have any questions in this regard, please contact this office.
Sincerely yours, c-f, I dQ1 - e L. T. Gucwa JAF/mb