ML20127P498

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-23 & 50-364/85-23 on 850422-26.No Violation Noted
ML20127P498
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/17/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20127P502 List:
References
NUDOCS 8505240010
Download: ML20127P498 (2)


See also: IR 05000348/1985023

Text

. . - . _ _. _ . . _ _

,

s' *

SAFEGUAngglf5CRMATl0N

, .

MAY 171985

Alabama Power Company.

-

ATTN: Mr. R. P. Mcdonald

Sertfor Vice President

P. O. Box 2641

-Birmingham, AL 35291

, Gentlemen:

' SUBJECT: REPURT NOS. 50-348/85-23 AND 50-354/85-23

On April 22-20, 1985, NRC inspected activities authorized by NRC Operating

Licensa Nos. NPF-2 and NPF-8 for your J. M. Farley facility. At the conclusion

of- the insp ction, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examine'd during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and -

. representative records, interviews with personnel, 3rd observation of activities

in progress. .

[

Within the scope of the inspection, r.o violations or deviations were identified.

E In accordance with.10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

. security measures are exempt from public disclosure; therefore, the enclosures to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in NRC's Public' Document Room.

-Should you have any questions concerning this letter, please contact us.

Sincerely,

1

David M. Verre111, Chief

..

Reactor. Projects Branch 1

M , Division of Reactor Projects

S Enclosures:

Inspection Report Nos. 50-348/85-23

and 50-364/85-23

.(SafeguardsInformation)

cc w/ enc 1:

W._0. Whitt, Executive Vice President

'J.'D. Woodard, Plant Manager

W. G. Hairston, III, Manager, Nuclear ENCLOSURE CONTAINS

Engineering and Technical Support SAFEGU" 95 IMFO!UfATION

EL: (TION THIS

cc w/ enc 1 cont'd: (See page 2) PA OONTROLLED.

'

g2gg g g ,,, , ,,

,

.

_g

a ~ 'm

,,,,.,qn,g7(OM

.

3 '

sgpf,G'J Abn-- ' . . L

- - -- . = _ - - -. ..

, -

Alabama Power Company

SAFEGUARDS INFORMATION

2 g 7g

ec w/ enc 1:

J. W.' McGowan, Manager-Safety Audit

and Engineering Review

H. O. Thrash, Manager, Nuclear-Operations

and Administration

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/SSPD

l'

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of Alabama

.

.

1

__.

RI PI ' RII RII RII

,

A

"D

'r.an : dr ufre K rr

)h

JPRohr

Qh

WRuland

fL/

FCantrell

5/ /85 5/ /85 5/f(/85 5/f//85 5/f)/85 5//p/85

'ONTAINs

' SAFEGUARD , IF. Aman"v" 29.. 50%'!""

Pwg1sDECONTROLLto,

,

.-...,,,,vE . - - - , , - . . - - - _ ~ - .-----..-,-e. - - - - , - , - , .