ML20127P471
| ML20127P471 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 06/26/1985 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Larson C NORTHERN STATES POWER CO. |
| Shared Package | |
| ML20127P477 | List: |
| References | |
| NUDOCS 8507020425 | |
| Download: ML20127P471 (1) | |
See also: IR 05000282/1985010
Text
)s
.
JUN 261985
Docket No. 50-282
Docket No. 50-306
Northern States Power Company
ATTN:
Mr. C. E. Larson
Vice President, Nuclear
Generation
414 Nicollet Mall
Minneapolis, MN 55401
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. J. E. Hard
and P. L. Hartmann of this office on April 14 through June 8, 1985, of
activities at the Prairie Island Nuclear Generating Plant, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-42 and No. DPR-60 and to the
discussion of our findings with Mr. Watzl and other members of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely
'<
8507020425 850626
gDR
ADOCK 050
282
W. D. Shafer, Chief
Reactor Projects Branch 2
Enclosure:
Inspection Report
No. 50-282/85010(DRP);
No. 50-306/85008(DRP)
cc w/ enclosure:
E. L. Watzl, Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Prairie Island
Resident Inspector, RIII Monticello
John W. Ferman, Ph.D., Nuclear Engineer, MPCA
R
RIII
Jack [p
r
06/20/85
,
i