ML20127P297

From kanterella
Jump to navigation Jump to search

Suppl to 921116 Application for Amends to Licenses DPR-62 & DPR-71,allowing Min Number of Operable Channels for One Reactor Steam Dome Pressure - Low Instrumentation Trip Sys to Be Temporarily Reduced from Two Channels to One Channel
ML20127P297
Person / Time
Site: Brunswick  
Issue date: 01/25/1993
From: Starkey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20127P302 List:
References
NLS-93-012, NLS-93-12, TAC-M85018, TAC-M85019, NUDOCS 9302010237
Download: ML20127P297 (3)


Text

_ _ _ _ _.

L' C9&L Carolina Power & Light Company P o. Dan 155'

  • Megn. N c 27602 January 25, 1993

" ", ",'*",$/"

p, SERIAL: NLS 93-012 Nem Sewes Dwtnwnt 10 CFR 50.90 TSC 92TSB09 Unitod States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2

~

DOCKET NOS. 50-325 & 50 324/ LICENSE NOS. DPR-71 & DPR 62 ECCS ACTUATION INSTRUMENTATION OPERABILITY (NRC TAC NOS, M35018 AND M85019)

Gentlemen:

By letter datad November 16,1992 (Serial No. NLS-92-296), Carolina Power & Light Company (CP&L) submitted a request to allow a one-time revision to the Technical Specifications for the Brunswick Steam Electric Plant (BSEP), Unit Nos.1 and 2. The proposed amendment will allow the minimum number of operable channels for one reactor steam dome pressure -low instrumentation trb system to be temporarily reduced from two (2) channels to one (1) channel.

This will allow, on three separate occasions, one reactor steam dome pressure low (injection permissive) channel to be placed in the inoperabie status for up to seven days without invoking ACTION statement requirements. This one-time revision to the Technical Specifications is needed to support modifications to upgrade the seismic qualification of instrument racks H21 P009 (Unit 2 ordy) and H21-P010 (Unit 1 and Unit 2). provides page change instructions for ir.corpo.ating the proposed eevisions into the Technical Specifications. Typed Unit 1 and Unit 2 Techniccl Specification pages are prnvided herein as Enclosures 2 and 3, respectively.

Please refer any questions iegarding this submittal to Mr. D. B. Waters at (919) 546-3678.

Yours very truly,

' 7(ll

}

R. B. Starkey, Jr.

WRM/wrm (nts93012.wpfl

Enclosures:

1.

Page Change Instructions 2.

Technical Specification Pages - Unt: 1 3.

Technical Specification Pages - Unit 2 290042 s\\

9302010237 930125 DR ADOCK 05000324 p

PDR

Document Control Desk NLS-93-012 / Page 2 R. B. Starkey, Jr., having been first duly aworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light

Company, bM?Ai(L Notary (Sb I) 0lbl$h5 go "'""'es e, My commission expires:

o cc:

Mr. Dayne H. Brown

/' '

s t

Mr. S. D. Ebneter fD/ y,93RY g r' $

Mr. P. D. Milano j "'l

,,4 j$

Mr, R. L. Prevatte f

5

\\

\\.

PU60% jul

'b'bh

--. c, -

1 d-i ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR 71 & DPH-62 ECCS ACTUATION INSTRUMENTATION OPERA 8ILITY (NRC TAC NOS. M85018 AND M85019)

PAGE CHANGE INSTRUCTIONS _

UNIT 1 Removed Pace Inserted Pace.

3/4334 3/4 3-34 3/4338 3/4338 UNIT 2 Removed Paae -

Inserted Pang 3/4 3-34 3/4334

-3/4338.

3/4 3-38

(.

El-1

.