ML20127P062
| ML20127P062 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 10/31/1976 |
| From: | Shamla W NORTHERN STATES POWER CO. |
| To: | |
| Shared Package | |
| ML20127P049 | List: |
| References | |
| NUDOCS 9212010492 | |
| Download: ML20127P062 (1) | |
Text
.. _ _ _.
2027
. ~v. 0 3/3/70 DOCEF NO. 50-263 U'i1T NAME
?buticello l
- o -
PJ CG4P11TED EY W. A. Shanla
'O' TELEi1DNE 612/295-5151 OS REPCRT MOM 11 October
~
Revision 1 09 u e-o-
SUITING D0hy F: FORCED DURATION TliE REACTOR OR i
i NO.
DATE S: SCHEDULED ; (HOURS)
RFASON (1)
REDUCING POWER (2)
CORRIri1VE ACTIONS /CO-f4ESTS Hi Flux Scram Received While 31 761003 F
! 6.9 B
3 Adjustments Were Being Made to j
j Test Stroke Speed Of Turbine g
Control Valve.
1 i
sult 32 761015 F
9.6 A
3 Hi flux Scram Received As A Re of Pressure Control System Failure (Turbine Control Valve Linkage l Failure).
33 761016 5
102.0 B
4 Outage Taken to Reduce Primary System Leakage in Drywell and To Replace Drywell Ventilation Fan I
l Motor. NOTE: Reactor Was in A Shutdown Condition (SD#32) Prior i
e g g Of This Outage.
T
! (1) REASi?i 1: Manual A: Equipnent Failure (Explain) 2: Manual Scram 3: Fbint. or Test 3: Autatatic Scram C: Rcfueling 4: Other (Explain) i D: Regulatory Restriction i
E: Operate Training sad i
License Examination SU5M GY: Operated As Base Loaded Unit.
'F: Administrat P.c G: Operational Error (Explain) t H: Other (Fip1,in)
_ _ _ _ _.. _ _ _ _