Monthly Operating Rept for Nov 1976 for Monticello Nuclear Generating Plant
ML20127P051
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/30/1976
From: Shamla W
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20127P049 List:
References
NUDOCS 9212010489
Download: ML20127P051 (3)


Text

- _ _ _ _ _ _ _ - _ _ _

2025 Rey, 0 3/3/76 9EC 0 71976 AVUMGE DAILY UNIT TOhD LLVEL DCCKET 10.

50 263 UNIT 1

DATE Jgccmber 2.1976_ _

CO@LLTED BY _ L A. Shamia TELEMONE 612/295 5151, Ext. 111

$0Nnt December AVERAGE IAILY RMER LINEL DAY AVERAGE DAILY 10hn LINEL DAY (FMo-Net)

(FMe Net) 1 532 17 540 2

338 18 541 3

350 19 542 4

449 20 536 5

531 21 515 6

539 22 536 7

519 23 538 8

541 24 538 418 25 535 9

10 315 26 536 11 100 27 532 12 193 28 493 13 388 29 529 14 495 30 532 15-537 31 16 539 92120104B9 761200 PDR ADOCK 05000263 R

pon a

-~ -,, -

7 r.,

2036 Rev. S ti/13/76.

OPERATING 11ATA REPORT IKC Ef NO.

50 263 UNIT 1

DATE Dej;3mber 2. 1976 Ca.lPIETED BY W._A._shamla TELEPflo'E 612/295-515_1, Ext. 111_,,

UPERATIfB STARIS N vember 720 1.

Reporting Period:

_ Gross llours in Report Period:

2.

Currently Authorized Power Leyel (5Mt):

1670_

Max. Depend. Capacity (MWe-NET):

J%

Design Electrical IJating (bMe-Net):

545.4

.ti.

Powr Level to h'hich Restricted (if any) (bMc-Net)>

None 4.

Reasons for Restriction (if any): N/A Till S F O Vril YR TO DATE CUSULATIVE 5.

Nttnber of flours Reactor Was Critical...........

705.6 7.483.8 37.332.4 6.

Reactor Reserve Shutdown flours.................

OJ 0.0 940,7 7

!!ours Generator On Line........................

698.6 7.344.7 36.081.1 8-Unit Reserve Shutdown flours....................

0,0 0.0 o,o

~9.

Gross Thermal Energy Generated (FMIO........... 1.068.336.0

11. 309 164. 8,_fL611dg2d t
10. Gross Electrical Energy Generated (f th11)........

358.600 3.826.230

_18.297.280 iJ. Net Electrical Energy Generated (5 Mil)..........

341.398

_ 3.653.434 17.474.526 M.

Itactor Service Factor.........................,

98.0%

93.1%-

78.6%

11 Rea: tor Availability Factor....................

98.0%

93.1%

80.5%

lo lin i Service Factor............................

97.0%

91 4%

75.or i

Enit Ava ilability Fac tor.......................

97.0%

91. 4_% _

75 3%

30.

linit Capacity Factor (Using IEC)...............

88.5%

84 3%

68.6%.

17.

Unit Capacity Facter (Using Design FMe)........

86.9%

83.3%

67.41 3.0%

_._1.2%

9.5%

18. Unit Forced Outage Rate........................
19. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Maintenance, 12/17/76, Three Day Duration.

N/A

-20.

If Shutdown at Fad of Report Period, Estimat"1 Date of Startup:

---o.--

v, s

2027 Rev. 0 3/3/76 DOCET No. 50-263

'bnticello UNIT NA>E UNIT SUTDOLCG AND IDER REDUCTIONS DATE December 2. 1976 CG!PLETED BY W.A. Shamla TELEFIRLE 612/295-5151 REPORT LITini Novecber Ext. 111

.'Elim OF ME,

SLTTING DOWN F: FORCED DURATION TIE REACICR OR 20.

DATE S: SOIEDULII)

(HOURS)

REASON (1)

REDUCING IUG (2)

CORRfLTIVE ACTIONS /COTETS Power reduced to 68% for 34 761102 F

0 B

4 repair of #11 feedwater pump motor coupling.

Power reduced to 61% for 4

35

'761109 F

0 B

repair of #12 feedvater pump.

Automatic scram received as 36 761111' F

21.4 G

3 result of inadvertant trip of low condenser vacuum scram instru-ment during surveillance test.

(2) MED G (1) REASO; 1: Bhnual Equi rient Failure (Explain) 2: Muraal Scram A:

t B: Maint. or Test 3: Automatic Scram C: Refueling 4: Other (Explain)

D: Regulatory Restriction E: Operator Training'and l

License Examination F: Administrative SIM4\\RY:' operated as base loaded G: Operational Error (Explain) l unit with weekend power reductions for surveillance II: Other (Explain) testing.'

1 L.

,