2025 Rey, 0 3/3/76 9EC 0 71976 AVUMGE DAILY UNIT TOhD LLVEL DCCKET 10.
50 263 UNIT 1
DATE Jgccmber 2.1976_ _
CO@LLTED BY _ L A. Shamia TELEMONE 612/295 5151, Ext. 111
$0Nnt December AVERAGE IAILY RMER LINEL DAY AVERAGE DAILY 10hn LINEL DAY (FMo-Net)
(FMe Net) 1 532 17 540 2
338 18 541 3
350 19 542 4
449 20 536 5
531 21 515 6
539 22 536 7
519 23 538 8
541 24 538 418 25 535 9
10 315 26 536 11 100 27 532 12 193 28 493 13 388 29 529 14 495 30 532 15-537 31 16 539 92120104B9 761200 PDR ADOCK 05000263 R
pon a
-~ -,, -
7 r.,
2036 Rev. S ti/13/76.
OPERATING 11ATA REPORT IKC Ef NO.
50 263 UNIT 1
DATE Dej;3mber 2. 1976 Ca.lPIETED BY W._A._shamla TELEPflo'E 612/295-515_1, Ext. 111_,,
UPERATIfB STARIS N vember 720 1.
Reporting Period:
_ Gross llours in Report Period:
2.
Currently Authorized Power Leyel (5Mt):
1670_
Max. Depend. Capacity (MWe-NET):
J%
Design Electrical IJating (bMe-Net):
545.4
.ti.
Powr Level to h'hich Restricted (if any) (bMc-Net)>
None 4.
Reasons for Restriction (if any): N/A Till S F O Vril YR TO DATE CUSULATIVE 5.
Nttnber of flours Reactor Was Critical...........
705.6 7.483.8 37.332.4 6.
Reactor Reserve Shutdown flours.................
OJ 0.0 940,7 7
!!ours Generator On Line........................
698.6 7.344.7 36.081.1 8-Unit Reserve Shutdown flours....................
0,0 0.0 o,o
~9.
Gross Thermal Energy Generated (FMIO........... 1.068.336.0
- 11. 309 164. 8,_fL611dg2d t
- 10. Gross Electrical Energy Generated (f th11)........
358.600 3.826.230
_18.297.280 iJ. Net Electrical Energy Generated (5 Mil)..........
341.398
_ 3.653.434 17.474.526 M.
Itactor Service Factor.........................,
98.0%
93.1%-
78.6%
11 Rea: tor Availability Factor....................
98.0%
93.1%
80.5%
lo lin i Service Factor............................
97.0%
91 4%
75.or i
Enit Ava ilability Fac tor.......................
97.0%
- 91. 4_% _
75 3%
30.
linit Capacity Factor (Using IEC)...............
88.5%
84 3%
68.6%.
17.
Unit Capacity Facter (Using Design FMe)........
86.9%
83.3%
67.41 3.0%
_._1.2%
9.5%
- 18. Unit Forced Outage Rate........................
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Maintenance, 12/17/76, Three Day Duration.
N/A
-20.
If Shutdown at Fad of Report Period, Estimat"1 Date of Startup:
---o.--
v, s
2027 Rev. 0 3/3/76 DOCET No. 50-263
'bnticello UNIT NA>E UNIT SUTDOLCG AND IDER REDUCTIONS DATE December 2. 1976 CG!PLETED BY W.A. Shamla TELEFIRLE 612/295-5151 REPORT LITini Novecber Ext. 111
.'Elim OF ME,
SLTTING DOWN F: FORCED DURATION TIE REACICR OR 20.
DATE S: SOIEDULII)
(HOURS)
REASON (1)
REDUCING IUG (2)
CORRfLTIVE ACTIONS /COTETS Power reduced to 68% for 34 761102 F
0 B
4 repair of #11 feedwater pump motor coupling.
Power reduced to 61% for 4
35
'761109 F
0 B
repair of #12 feedvater pump.
Automatic scram received as 36 761111' F
21.4 G
3 result of inadvertant trip of low condenser vacuum scram instru-ment during surveillance test.
(2) MED G (1) REASO; 1: Bhnual Equi rient Failure (Explain) 2: Muraal Scram A:
t B: Maint. or Test 3: Automatic Scram C: Refueling 4: Other (Explain)
D: Regulatory Restriction E: Operator Training'and l
License Examination F: Administrative SIM4\\RY:' operated as base loaded G: Operational Error (Explain) l unit with weekend power reductions for surveillance II: Other (Explain) testing.'
1 L.
,