r
94
a-
.
,
MAY 8
1985
Georgia Power Company
ATTN:' Mr. R. J. Kelly
Executive Vice President
-P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: -REPORT NOS. 50-424/85-18 AND 50-425/85-18
This letter refers to the technical meeting held at your request in the NRC
Region II Office on May 1,1985. This meeting concerned activities authorized
by NRC Construction Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility.
_
The meeting provided Georgia Power Company (GPC) an opportunity to demonstrate
the ability of their ultrasonic examination procedure and equipment to detect,
locate, and size actual crack flaws propagating from the pipe inside diameter in
centrifugally cast stainless steel as discussed in the enclosed report.
It is our opinion that this meeting was informative and beneficial to both NRC
and GPC because of the exchange of information concerning inspection of cast
stainless steel.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in NRC's Public Document Room unless you notify this office by
telephone within 10 days of the date of this letter and submit written applica-
tion to withhold information contained therein within 30 days-of the date of the
letter.
Such application must be consistent with the requirements of
2.790(b)(1).
j
Should you have any questions concerning this matter, we will be pleased to
i
discuss them.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactar Projects
Enclosure:
Inspection Report No. 50-424/85-18
and 50-425/85-18
cc w/ enc 1:
(See page 2)
8507020230 850508
ADOCK 05000424
G
'EEO/
J
o
,
Georgia Power Company
2
pg4y g
tgg
cc w/ enc 1:
R. E. Conway, Senior Vice Presider.t
Nuclear Power
'
D. O. Foster, Vice President
and General Manager Vogtle Project
H. H. Gregory, III, General
Manager, Vogtle Nuclear Construction
G. Bockhold, Jr., Vogtle
Plant Manager
L. T. Gucwa, Chief
Nuclear Engineer
Ruble A. Thomas,
Vice President-Licensing Vogtle
Project
'-
Ed Groover, Quality
Assurance Site Manager
C. W. Hayes, QA Manager
J. T. Beckham, Vice President
& General Manager - Operations
J. A. Bailey, Project Licensing
Manager
George F. Trowbridge, Esq.
Shaw, Pittman, Potts and Trowbridge
Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge
Ernest L. Blake, Jr. , Esq.
Shaw, Pittman, Potts and Trowbridge
James E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
James G. Ledbetter, Commissioner
Department of Human Resources
Charles H. Badger, Office of
Planning and Budget, Management
Review Division
Deppish Kirkland, III, Counsel
Office of the Consumer's Utility
Council
Douglas C. Teper, Georgians Against
Nuclea- Energy
Laurie Fowler, Legal Environmental
Assistance Foundation
Tim Johnson, Executive Director
Educational Campaign for a Prosperous
Morton B. Margulies, Esq., Chairman
Administrative Judge, Atomic Safety
and Licensing Board Panel
Dr. Oscar H. Paris, Administrative Judge
Atomic Safety and Licensing Board Panel
Gustave A. Linenberger, Jr. , Administrative
Judge, Atomic Safety and Licensing Board
Panel
bec w/ enc 1:
(See page 3)
_
.
,
Georgia Power Company
3
gyg
bec w/ encl:
E. Reise, ELD
M. Sinkule,MTEB, NRR
RII
M...R.
Hum,
NRC Resident Inspector
Document Control Desk
State of Georgia
,-
I
RIL .
kI
a
Q%K
R ewsome:bhg
Blaki-
ARHerdt
MS nkule
5/4 /85
5/'//85
5/1/85
5/ l/85
1