MAY 2 21985
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN: Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection Report No. 50-213/85-04
This refers to the routine safety inspection conducted by Richard K. Struckmeyer
of this office on March 11-15, 1985, at the Haddam Neck Plant of activiti.es
authorized by NRC License No. DPR-61 and to the discussions of our findings
held by Richard K. Struckmeyer with Mr. R. Graves and others of your staff at
the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. Within these areas, the in -
s
spection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
In addition, our Mobile Laboratory was also brought to your site and used by
the inspector to make certain independent measurements. The basic purpose of
these independent measurements is to verify your capability for analyzing
radioactive effluents, and to achieve and maintain comparable methods of
>
analyses between your facility and the NRC.
The complete data from these
measurements will be reported in a subsequent Inspection Report.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter, and submit writt'en
application to withhold information contained therein, within 25 calendar days
from the date of transmittal letter.
Such application must be consistent with
the requirements of 10 CFR 2.790(b)(1).
If we do not hear from you in this
regard within the specified periods noted above, the report will be made
available to the public and placed in the Public Document Room. The telephone
notification of your intent to request an extension of the 10-day period which
you believe necessary should be made to the Chief, Document Control Section,
-
USNRC Region I, at (215) 337-5223.
8507020224 850522
ADOCK 05000213
0
i l
OFFICIAL RECORD COPY
IR HADDAM NECK 85-04 - 0001.0.0 h
05/16/85
-
.
-
.
.
Connecticut Yankee Atomic Power Co. 2
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Ori i"alSIR"*0BY*
- ghd k.
NLh
Thomas T. Martin, Directo W
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Region I Inspection Report No. 50-213/85-04
cc w/ enc 1:
R. Graves, Plant Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
J. F. Opeka, Vice President, Nuclear Operations
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encis)
Section Chief, DPRP
RI:DRSS //J
RI:DRS
RI:DR k
RI:
RI
Struckmeyer/sm
Jang
8
Cioffi()
Shanbaky
Be) lamy
0.f/ 7/85
04/$3/85
V
04/)3/85
06//4'85
04/)D/85
h
0FFICIAL RECORD COPY
IR HADDAM NECK 85-04 - 0002.1.0
04/16/85