Advises That Valve Wall Thickness Verification Program for Plant Completed in Accordance W/Criteria Established by Bh Grier
ML20127N770
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/12/1974
From: Wachter L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9212010411
Download: ML20127N770 (1)


Text

_ _ - _ _ _ - _ - _ - _ _

  1. t e

{

NSP

^

NORTHERN STATES POWER COMPANY uiwwa Apou e, wiwsu.ou es4oi March 12, 1974 Mr J G Keppler, Regional Director U S Atomic Energy Commission Directorate of Regelstory Operations, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr Keppler:

MONTICELLO NUCLEAR GENERATING PLANT AEC Docket No.30-263

~

Valve Wall Thickness Verification This letter is to advise you that the Valve Wall Ihickness Verification Program for our Monticello Nuclear Generating Plant has been completed in accordance with the criteria established by Mr B H Grier's letter of June 29, 1972.

In our November 3, 1972 letter we stated that our program would include approximately 72 valves.

Since then the scope of our program was it. creased to 98 valves. These valves were examined during our 1973 refueling oun ge and a subsequent plant outage.

The wall thickness of all 98 valves were found to satisfy their service requirements. There were only two valves whose measured minimum wall thickness did not exceed their design values, but based on their documented mechanical characteristics of the material, their wall thicknesses were determined to be adequate. These wall thickness deficiencies were more than adequately compensated by their actual tensile and yield strengthu which exceeded the minimum specified by the ASTM standard for the valve body material.

Therefore the data obtained from the Valve Wall Thickness Program verified the adequacy of the wall thickness of valve bodies within Monticello's Reactor Coolant Pressure Boundary. The evaluation and inspection data of our program is on file at our Monticello Plant and we would be happy to review it with your inspectors during any of their site visits.

Yours very truly, L J WYchter, Vice President Power Production & System Operation LJW/ma cc: J F O' Leary