Forwards Insp Repts 50-424/85-13 & 50-425/85-13 on 850323-0506.No Violations or Deviations Identified.Response to Unresolved Items Noted in Insp Repts Invited
ML20127N105
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/22/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20127N107 List:
References
NUDOCS 8507010434
Download: ML20127N105 (3)


See also: IR 05000323/2005006

Text

~

/

MAY 2 21985

Georgia Power Company

ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen

SUBJECT: REPORT NOS. 50-424/85-13 AND 50-425/85-13

On March 23 - May 6,1985, NRC inspected activities authorized by NRC Construction

Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the conclusion of

I

the inspection, . the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is -invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosures:

Inspection Report Nos. 50-424/85-13

>

and 50-425/85-13

cc w/ enc 1:

(See page 2)

8507010434 e50522

4

ADOCK050g4

DR

k

3~E 8/

".

.

MAY 2 21985

d

Georgia Power Company

2

'

cc w/ encl:

R. E. Conway, Senior Vice President

Nuclear Power

D. O. Foster, Vice President

and General Manager Vogtle Project

H. H. Gregory, III, General

Manager, Vogtle Nuclear Construction

G. Bockhold, Jr., Vogtle

Plant Manager

L. T. Gucwa, Chief

Nuclear Engineer

Ruble A. Thomas,

Vice President-Licensing Vogtle

Project

Ed Groover, Quality

Assurance Site Manager

C. W. Hayes, QA Manager

J. T. Beckham, Vice President

& General Manager - Operations

J. A. Bailey, Project Licensing

Manager

-

George F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge

Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge

Ernest L. Blake, Jr. Esq.

Shaw, Pittman, Potts and Trowbridge

James E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

James G. Ledbetter, Comissioner

Department of Human Resources

Charles H. Badger, Office of

Planning and Budget, Management

Review Division

Deppish Kirkland, III, Counsel

Office of the Consumer's Utility Council

Douglas C. Teper, Georgians Against

Nuclear Energy

Laurie Fowler, Legal Environmental

Assistance Foundation

Tim Johnson, Executive Director

Educational Campaign for a Prosperous

Georgia

Morton B. Margulies, Esq., Chairman

Administrative Judge, Atomic Safety

and Licensing Board Panel

Dr. Oscar H. Paris, Administrative Judge

Atomic Safety and Licensing Board Panel

Gustave A. Linenberger, Jr., Administrative

Judge, Atomic Safety and Licensing Board Panel

-

-

.

y g s 1985

'

Georgia Power Company

3

bec w/ encl:

E. Reise. ELD

M. Sinkule RII

'NRC Resident Inspector

Document Control Desk

State of Georgia

II

RI jf

RII

l

ankin:km

MSinkule

VBrownlee

5/y/85

5/p/85

5/ /8