ML20127N096
| ML20127N096 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/20/1985 |
| From: | Cutter A CAROLINA POWER & LIGHT CO. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| NLS-85-034, NLS-85-34, NUDOCS 8505230436 | |
| Download: ML20127N096 (2) | |
Text
r8
.y CD&L Carolina Power & Light Company MAY 2 01985 SERIAL: NLS-85-034 Director of Nuclear Reactor Regulation Attention: Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2
- Division of Licensing United States Nuclear Regulatory Commission
- Washington, DC. 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET.NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 IN-SERVICE INSPECTION INTERVALS
Dear Mr. Vassallo:
Section'XI, paragraph IWA-2420 of the ASME Boiler and Pressure Vessel Code specifies In-Service Inspection Intervals. These inspection intervals are related to the date of initial-start of. power unit commercial operation. The Code of Federal Regulations, Title 10, Part 50.55a, requires that In-Service. Inspection Programs meet ' the requirements of the edition and addenda to the ASME Code in effect twelve months prior to the start of an interval. Because the two units at the Brunswick site have start of commercial operation dates which differ by approximately fifteen months, the possibility of having In-Service Inspection Programs conforming to different editions of the code exists.
In order to preclude this possibility, Carolina Power & Light Company requests approval to begin the second inspection interval for each unit on a common date. This date will correspond to the date midway between the first interval expiration dates for the two units. The date is to be July 10, 1986 and is based on first interval expiration dates of
~ March 17, 1987 and November 2,1985 for Units 1 and 2. respectively.- First interval inspections for both units will be completed within the time specified in the ASME Code.
~ This request is made in accordance with provisions set forth in the Code of Federal Regulations, Title 10, Part 50.55a, paragraph g (10 CFR 50.55a(g)) which grants a licensee the right to determine that conformance to certain ASME Boiler and Pressure Vessel Code requirements is impractical for his facility.
Your response to this request is needed no later than October 1,1985 in order to have the
. second interval In-Service Inspection Program in place prior to the beginning of the proposed second interval commencement date.
We have reviewed this request in accordance with 10 CFR 170.12 and are enclosing a check in the amount of $150 in payment of the required fee.
1 I
/f G
8505230436 850520 iL PDR ADOCK 05000324:
i G
PDR{
}
' 0 dd
(
m.v n... si,....,. o. e. iss,. n.,... ~ c m m
- J2a
' '.Mr. D, B. Vr_ssalla Pag 2 2 Should you have any questions regarding this matter, please call Mr. Sherwood R.
Zimmerman at (919) 836-6242.
Your ery trul f/
d A. B. Cutter - Vice Pres ent Nuclear Engineering & Licensing RWS/ccc (1096NLU)
Enclosure cc:
Mr. D. O. Myers (NRC-BNP)
Mr. J. P. O'Reilly (NRC-RII)
Mr. M. Grotenhuis (NRC)