ML20127N050

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/85-15 & 50-364/85-15 on 850311-28.No Violations or Deviations Identified
ML20127N050
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/23/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20127N052 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8507010420
Download: ML20127N050 (2)


See also: IR 05000348/1985015

Text

F-

y6f/W

'

s

May 23,1985

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-15 AND 50-364/85-15

On March 11 - 28, 1985, NRC inspected activities authorized by NRC License

Nos. NPF-2 and NPF-8 for your Farley facility. At the conclusion of the

inspection, the findirgs were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by DMVerrelli)

David M. Verre111, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-348/85-15

and 50-364/85-15

cc w/ enc 1:

W. O. Whitt, Executive Vice President

J. D. Woodard, Plant Manager

W. G. Hairston, III, Manager, Nuclear Engineering

and Technical Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

H. O. Thrash, Manager, Nuclear Operations

and Administration

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

bec w/ enc 1: (See page 2) B507010420 050523

pon Apocg o3o0034s ,

O PDH \

.EO/

- ,

,_

.

T. . _ *s

.

Alabama Power Company 2 May 23, 1985

bec w/ encl:

NRC Resident Inspector

E. Reeves, Proje:t' Manager, NRR

Document Control Desk

State of Alabama

.

t

,,6

.

6

.

DFalconer:sa C u }0n AFGitEon FC1 roll

05/fd85 05/ 85 05/g\/85 05/ W 85