.e pp DUKE POWER COMPANY P.O. box 33189 onAnwrra. w.c. sas4e

.HAL B. WGKER Ten.umows

. veo..

(704) 373-453 June 26, 1985

===.

'Mr. Harold R. Denton' Director

~

Office of. Nuclear Reactor Regulation U..S. Nuclear ~ Regulatory Commission Washington, D.' C.

20555.

- Attention:- Ms. E. G. Adensam, Chief.

Licensing Branch No. 4

Subject:

} Catawba' Nuclear Station

-Docket Nos. 50-413 and 50-414

Dear Mr.:

Denton:

In response to Mr. Charles Gackins.(NRC/NMSS), questions-concerning the security portion of'the Safety Evaluation Report'(SER) for Catawba Nuclear. Station-(Unit 2), the following is provided, n.

Pu'rsuant to 10 CFR 50.34(c),. Duke Power Company submitted the Catawba Nuclear' Station Security Plan dated June _29, 1981, which outlined Duke's

. plans..to provide physical protection for Units 1 and 2 in accordance with

~

the requirements of_10 CFR 73.55.

_18,:1984, the'NRC approved Catawba Nuclear Station

' Beginning.on July Security Plan, Revision 5~ Additional Pages, dated' June 25, 1984 was implemented'for Unit 1 only since Unit 2 was still in the construction

- phase. fSince July'18, 1984-interim security measures have been implemented

-. which included the use of an interim barrier to separate Unit 1 from

. Unit 2. >These interim measures are detailed in the Catawba Nuclear

. Station Security Plan,. Revision 7 dated November-28, 1984 in Chapter 10.0 Construction Operations.

Based on current scheduling, Duke Power Company plans to-incorporate Unit::2.into the security protected area during October 1985. As part of this -transition, Duke Power Company plans to submit a revision to the F

. Catawba Nuclear Station Security Flan to delete the' interim barrier i

requirements.

Physical. protection measures.(including vital area protection) will be i

fully implemented for Unit'2. prior to the~ receipt of an operating license.

c Very truly yours,

/h

. Hal B. Tucker

RWO: sib

[

8

?-

8507010358 850626 IfD PDR ADOCK 05000413

/

F PDR

.., _, _. ~.., _.,. _.. _ _. _ -.. _..

'o Mr..Harsld R. Denton, Dirzetcr June 26, 1985 Page Two I

Dr. J. Nelson Grace,' Regional Administrator cc:

U. S. Nuclear. Regulatory Commission Region II.

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident-Inspector Catawba Nuclear Station Palmetto Alliance

-2135 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley.

Carolina Environmental Study Group 85's Henley Place Charlotte, North Carolina 28207 Robert Guild. Esq.

P. 0. Box 12097 Charleston, South, Carolina 29412 k_