ML20127M650
| ML20127M650 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/13/1985 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20127M654 | List: |
| References | |
| NUDOCS 8507010315 | |
| Download: ML20127M650 (4) | |
Text
, [f c
UNITED STATES
' 'g NUCLEAR REGULATORY COMMISSION L
- j WASHINGTON, D. C. 20555 k, +... +,o 8
g PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY
~
ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 38 License No. DPR-75 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated October 15, 1984, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the
-s Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 2-B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common.
defense and security or tc the health and safety of the public; and E.
The issuance of this anendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-75 is hereby amended to read as follows:
8507010315 850613 PDR ADOCK 05000311 P
. 6 (2) Technical Specifications The Technical-Specifications ~ contained in Appendices' A and B, as revised through Amendment No. 38, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUC AR EGULATORY C0ffilSSION A
tv ga, C i Operating Reactors nch #1 Division of Licensing
Attachment:
Changes to the Technical Specifications June 13, 1985 Date of Issuance:
O O
,_y,
e ATTACHMENT TO LICENSE AMENDMENT NO. 38 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Revise Appendix A as follows:
Remove Pace Insert Page 3/4 6-11 3/4 6-11 2
S
+
CONTAINMENT SYSTEMS SPRAY ADDITIVE SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.2 The spray additive system shall be OPERABLE with:
a.
A spray additive tank containing a volume of between 2568 and 4000 gallons of between 30 and 32 percent by weight NaOH solution, and b.
Two spray additive eductors each capable of adding NaOH solution from the chemical additive tank to a containment spray system pump flow.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
With the spray additive system inoperable, restore the system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STAN0BY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the spray additive system to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.2.2 The spray additive system shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying that each valve (manual, -
power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
b.
At least once per 6 months by:
~
Verifying the solution level in the tank, and 1.
2.
Verifying the concentration of the NaOH solution by chemical
- analysis, c.
At least once per 18 months during shutdown, by verifying that each automatic valve in the flow path actuates to its correct position on a Containment High-High pressure test signal, d.
At least once per 5 years by verifying a NaOH solution flow rate of 12.013.0 gpm from the spray additive tank through sample valve 2CS61 with the spray additive tank at 2.5 2 0.5 psig.
SALEM - UNIT 2 3/4 6-11 Amendment No. 38 i