Forwards Insp Rept 50-305/85-06 on 850416-0615.No Violation Noted
ML20127M641
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/26/1985
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hintz D
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20127M645 List:
References
NUDOCS 8507010309
Download: ML20127M641 (1)


See also: IR 05000305/1985006

Text

. .

  • p

y .'

JUN 261985 -

Docket No. 50-305 '

Wisconsin Public Service Corporation

ATTN: Mr. D. C. Hintz

Manager

Nuclear Power

Post Office Box 19002

Green ~ Bay, WI 54307-9002

..

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. L. Nelson of

this office during the period of April 16, 1985 through June 15, 1985, of

activities at Kewaunee Nuclear Power Plant authorized by NRC Operating License

No. DPR-43 and to the discussion of our findings with Mr. C. R. Steinhardt on

June 14, 1985.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

terviews with personnel. ,

-

-

'Stions of noncompliance with NRC requirements were identified during the

-

,f this inspection.

.

,cordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

'

cer and the enclosure will be placed in the NRC Public Document Room.

de will gladly discuss any questions you have concerning this inspection.

Sincerely,

k. ,

Y

W. D. Shafer, Chief

Reactor Projects Branch 2

Enclosure:

Inspection Report

No. 50-305/85006(DRP)

cc w/ enclosure:

C. R. Steinhardt, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief 3507010309 850626

Boiler Section PDR ADOCK0500g5

Ness Flores, Chairperson G

Wisconsin Public Service

Commission

RIII RIII RII

&Burg s /rr ' ac

t' s

j

&V

a or

O'6/2 /85 -

1

l)/ \