ML20127M631

From kanterella
Jump to navigation Jump to search
Forwards License Change Application 227 to License NPF-1, Deferring Unscheduled SG ISI Required by TS 4.4.5.3.c.1 Following primary-to-secondary Tube Leakage in Excess of TS Limits
Date released: 05/20/2020 Download: ML20127M631


Proposed Tech Specs for Deferral of Unscheduled Steam Generator ISI
ML20127M639
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/16/1992
From:
PORTLAND GENERAL ELECTRIC CO.
To:
References
Download: ML20127M639 (56)
License Change Application 227 to License NPF-1,revising TS to Defer Unscheduled SG ISI Required by TS 4.4.5.3.c.1 Following primary-to-secondary Tube Leakage in Excess of TS Limits
ML20127M636
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/26/1992
From: Robinson W
PORTLAND GENERAL ELECTRIC CO.
To:
References
Download: ML20127M636 (9)
Forwards License Change Application 227 to License NPF-1, Deferring Unscheduled SG ISI Required by TS 4.4.5.3.c.1 Following primary-to-secondary Tube Leakage in Excess of TS Limits
ML20127M627
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/26/1992
From: Cross J, Robinson W
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20127M627 (2)