| Site: | Hope Creek |
| Issue date: | 06/25/1985 |
| From: | Mittl R Public Service Enterprise Group |
| To: | Butler W Office of Nuclear Reactor Regulation |
| References | |
| MF-02-01, MF-2-1, NUDOCS 8507010265 | |
| Download: ML20127M526 (2) | |
Text
_ _ _ _ _ _ _ _ _
Pebhc Sevce PS G Com;nny l
E ectnr
.d Gas 80 Park Plaza, Newark, NJ 07101/ 201430-8217 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 Robert L Mitti General Manager Nuclear Assurance and Regulaiion June 25, 1985 Director of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Attention:
Mr. Walter Butler, Chief Licensing Branch 2 Division of Licensing Gentlemen:
RESPONSE TO PVORT CONFIRMATORY ISSUE B.1 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Pursuant to the NRC PVORT/SQRT audit held at the Hope Creek Generating Station on May 7-10, 1985, Public Service Electric and Gas Company (PSE&G) hereby submits response to PVORT Confirmatory Issue B.1 - HPCI Turbine Nameplate.
This issuo focused on relocating the HPCI turbine nameplate to an area adj acent to the HPCI Turbine.
PSE&G confirms that this effort is complete and the nameplate is restored to its proper position.
Also provided ( see attachment) is a revised schedule of submittal to NRC of the remaining HCGS PVORT/SQRT audit issues.
Should you have any questions in this regard, please contact us.
Very truly yours, l.L. HWF) 8507010265 B50625 PDR ADOCK 05000354 PDR A
At tachment fo\\
C D. M. Wag ne r 1
USNRC Licensing Proj ect Manager ll\\
A.
R.
Bloug h USNRC Senior Resident Inspector MF 02 01 The Energy People I
96 4912 (7.0 4-84
o.
ATTACHMNT Cmpletion
' Item Description Date SORT Confirmatory Itan 1 HCU pipirg too flexible 8/15/85 NSSS-2 HCU 05-213-0643 SCRT Confirmatory Itan 2 HCU piping not attached to 8/15/85 PESS 2HCU 05-213-0643 gang support SQRT Confirmatory Itan 3 ITr' actuator qual. report Cmplete 6/11/85 BOP-2 INAC Demper lHD-9603 BI
'1 SQRT Confirmatory Itan 4 ITr actuator support 8/1/85 - The work BOP-2 HVAC Damper lHD-9603 DCP 299 required for the ITT BI actuator on HVAC danper 1HD-9603 BI has been cmpleted. Work on the remaining three actua-tors will be cmpleted by 7/15/85 with docu-mentation provided by 8/1/85.
SQRT Confirmatory Itan 5 Purther clarification of Cbnplete - 6/11/85i FSAR DSER.Open Item 103 Open Itan 103 Anendnent 11 SORT Confirmatory Itan 6 SST tubing 8/1/85 NSSS-9 RPV Ievel and Pressure Rack SORT Open Itan 1 Describe methodology of Cmplete 6/11/85 panel RRS SCRT Generic Issue 1 Relative displacements 8/15/85 NSSS-1 Core Spray Punp determined on modal level 1AP-206/E21-C001 PVORT Generic Issue 1 Written confirmation for Prior to fuel load qual. and install., and evaluation of final design loads for all punps and valves
' PVORT Confirmatory Iten 1 HPCI turbine naneplate Chnplete 6/25/85 PVORT Open Itan 1 Service Blocked cyclone separator 7/15/85 Mttr Punp AD-502 IM D2Vw.
6/25/85 MF 02 01